My WebLink
|
Help
|
About
|
Sign Out
Home
2009_0518_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2009
>
2009_0518_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2012 2:47:18 PM
Creation date
1/6/2012 2:54:41 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
29 FINANCIAL IMPACTS <br />3o The estimated engineering and construction cost for this project is $693,000. Staff proposes this project <br />31 be funded through the loans available from the PFA. The PFA intends to provide small base grants to <br />32 all eligible projects, with additional grant funds potentially available based on affordability criteria. For <br />33 most projects, the majority of project financing will be in the form of low interest loans with discounts <br />34 from market rates as provided in PFA rules. <br />35 STAFF RECOMMENDATION <br />36 Staff recommends approval of a resolution for the Minnesota Public Facilities Authority application for <br />37 the Drinking Water Revolving Fund. <br />38 REQUESTED COUNCIL ACTION <br />39 Approval of a resolution for the Minnesota Public Facilities Authority application for the Drinking <br />40 Water Revolving Fund. <br />Prepared by: Kristine Giga, Civil Engineer <br />Attachments: Resolution <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.