Laserfiche WebLink
CASE NUMBER: 1297 -81 <br />FL z CANT : Union carbide Corporation <br />4 �= <br />4 February 1981 <br />Page Two <br />provisions for expansion to approximatel <br />;'note from the site to plan that three times that size. w� 11 <br />• parking is Provided on the east side <br />structure (mc re than ample) with the area � f this <br />to the east to be around the building and the land <br />plat il'it❑ grass. We feel that the redev <br />land in this wad (now a gravel parking elopement of this <br />effect on the atmosphere p rig areal will have a very desirable <br />p ere i n this area of Long Lake Road and ' <br />to the potential for contiguous properties will contribute <br />P p ties as well. <br />4. On the easy end of the sits, they propose to add a building fronting on <br />the service cad contiguous to Interstate to 3 5W; This buy. <br />display of equipment fldi ng will �� far <br />or the sale of <br />• welding products. is . Adequate parki n <br />zs Proposed fox this area on the east side with g <br />to be added between the ark ' � new grass and landscaping <br />p i ng and the service road. Another si ni <br />improvement in this area will be the � f i cant <br />constructing of a storm filling of the ditch and the <br />rm sewer in the front of the propert , thus a <br />for the development of a grass area � Zlowing <br />be developed between the parkin <br />and the s er`vic a road . This area as well g <br />buildings will be Z ands ca ed a s the new grass area around the <br />p � substantially improving the aesthetic <br />gualitY of this end of the site <br />Around the' periphery of the site a the propose - <br />install curbing with, grass p to tear up the asphalt and <br />g ss strip both on the north side and the sou <br />side of the existing truck th <br />approx zmatel parking areas. Trees wi lZ be planted <br />50 feet on center all around the center <br />Of the site. <br />5- In the northeast corner of the n <br />westerly third. o f the s � ew grass area to be cons trusted ors the <br />ate, they propose to construct a 50 foot <br />beamed area for the temporary retention b l� a f oo -� <br />n o f lime, � a by-product o f the <br />manufacture of acetylene gas. The resulting <br />a slurry which is normally .ir+nc product is suspended in <br />trucked to Off-site y pumped into tanks within the building, and <br />customers on a regular basis. As t <br />the outside holding area is utilized o nl we understand it <br />customers are delayed in ens tanks, �n the event that the off -site <br />� pty� �'lg the and the Outside de S ito <br />is then needed so as to not interru ry <br />applicants have indicated this occurs pt the manufacturing process. The <br />on rare events, and perhaps <br />all. The Cornn�ission r�ta.y wish to disco p ps not at <br />at the hearing. discuss this opera with the applicant <br />The operations to be co nduc ted with-in <br />same length with t the building have been discussed at <br />he Fire Marshall a who has concluded that <br />represent no hazard to public safety. e operations <br />6. you will riots in reading the cure <br />"the t mm amend as adopted, that it specifies that <br />ypes of flaable gases and liquids to be s <br />Packaged are specified ix"3 the special *f toed � professed, �1'�d <br />be processed are pedal use pe snit � The types of gases to <br />generally outlined in the zLttached letter subm <br />the applicant. The Commi s s ion and i tted by <br />Council l xnay wish to question the <br />