Laserfiche WebLink
23 4.0 REVIEW OF REQUEST <br />24 In 2009, AEON received approval of a Planned Unit Development (PUD) to rehabilitate <br />25 the Har Mar Apartments, complete site improvements, and construct a new 50 -unit rental <br />26 complex. Since that date, AEON has been working with the Minnesota Department of <br />27 Transportation and the City of Roseville to acquire a small triangular piece of land <br />28 directly north of the Sienna Green site. AEON is required to include this land with the <br />29 existing Lot 2 of the subdivision plat approved with the PUD and also amend the PUD <br />30 Agreement to incorporate the land into the development and to shift the proposed 50-unit <br />31 structure. There is also an existing public easement that needs to be vacated and <br />32 relocated as a component of the project. However, recently the City Attorney has <br />33 determined that the land, although in fee title, is also an easement, for which the whole <br />34 triangular piece must be vacated. This action will occur at the May 4 Planning <br />35 Commission Meeting and then combined with the three items contained in the report and <br />36 presented to the City Council for action. <br />37 5.0 BACKGROUND <br />38 As stated previously, AEON received approval of their PUD in June, 2009 for Sienna <br />39 Green. This PUD and the associated agreement included specific perimeters within <br />40 which site improvements and development at Sienna Green was to occur. Since the <br />41 recent acquisition (transference from City to AEON) the small triangular piece of land <br />42 (directly north and adjacent the frontage road and an item discussed throughout the <br />43 approval process) and a necessary change in the building footprint design and location, <br />44 the PUD Agreement requires modification, the existing Lot 2 needs to be replatted, and <br />45 an existing public easement needs to be vacated. A new utility and drainage easement <br />46 will replace the vacated easement on the new subdivision plat. <br />47 6.0 PRELIMINARY /FINAL PLAT <br />48 6.1 The PRELIMINARY PLAT proposed for the Sienna Green development seeks to create <br />49 Lot I. Blockl , Sienna Green Second Addition by combining the existing Lot 2 with the <br />50 recently acquired triangle. The size of the new lot will increase from a former 48,351 or <br />51 1.1 acres to 54,918 or 1.26 acres after all dedications have been provided. <br />52 6.2 With the recently approved Vacation of the Public Highway Easement, the new Lot 1, <br />53 Block I. Sienna Green Second Addition provides all necessary and required utility and <br />54 drainage easements and dedications. <br />55 7.0 STAFF COMMENTS, RECOMMENDATION, AND CONDITIONS <br />56 7.1 The Development Review Committee reviewed the proposed Preliminary Plat, Easement <br />57 Vacation, and PUD Agreement Amendment on March 10 and 17, 2011. The Committee <br />58 did not have any specific concerns with the proposal or the documentation provided in <br />59 support of the project. The DRC and the Planning Division recommend that all actions <br />60 sought by AEON be supported. <br />61 <br />Page 2 of 3 <br />