Laserfiche WebLink
4.0 BACKGROUND <br />4.1 The property at 2280 Walnut Street has a Comprehensive Plan designation of Industrial <br />(I) and a corresponding zoning classification of Industrial (I) District. <br />4.2 The Preliminary Plat has been prompted by the need to create a separate lot for AirGas <br />North Central to development a gas processing and distribution facility (oxygen, <br />nitrogen, nitrous oxide, and carbon dioxide) on the eastern piece of the 2280 Walnut <br />Street parcel. <br />4.3 The proposed lot to be utilized by AirGas North Central will comprise the eastern <br />portion, a triangular lot lying between the north /south rail spur and the Minnesota <br />Commercial Rail line, and front along Terminal Drive. The remainder of the 2280 <br />Walnut Street parcel will be platted as an outlot and require future subdivision when <br />other uses /developments are brought forward. <br />4.4 The Conditional Use portion of the request is related to the storage of bulk gas cylinders <br />outdoors within concrete bunkers at the rear or western portion of the site. <br />4.5 For the sake of clarification, the nature of an "outlot" is such that it may not be developed <br />until it is re- platted. In this case, the intent is to plat the proposed Outlot A when future <br />development scenarios are solidified enough to determine where lot lines will be most <br />appropriate. <br />5.0 PRELIMINARY /FINAL PLAT ANALYSIS <br />5.1 Plat proposals are reviewed primarily for the purpose of ensuring that all proposed lots <br />meet the minimum size requirements of the zoning code, that adequate streets and other <br />public infrastructure are in place or identified and constructed, and that storm water is <br />addressed to prevent problems either on nearby property or within the storm water <br />system. As a Preliminary Plat of an industrial property, the proposal leaves no zoning <br />issues to be addressed since the Zoning Code does not establish minimum lot dimensions <br />or area. <br />5.2 Roseville's Development Review Committee, a body comprising staff from various City <br />departments, met on March 10 and 17, 2011 to discuss the application. There were no <br />outstanding issues addressed at the meeting regarding the subdivision submittal. <br />Specifically, the plat submittal included all necessary easements and road right -of -way. <br />However, the private ponds easements shown on the preliminary plat were requested to <br />be removed for these will not be public ponds. The final plat does not include the pond <br />easements, only the appropriate and required easements sought by the City. <br />5.3 The DRC did have a few comments regarding site access, site improvements, and <br />clarification on other building related items. However, these items are not germane to the <br />requested approval and will be addressed as a component of the building permit process. <br />5.4 After the Planning Commission meeting of April 6, 2011, the applicant submitted revised <br />documents to the City for review and consideration by the Planning Division and <br />Engineering Division. These plans have been reviewed and both divisions support the <br />combination and approval of the preliminary and final plat for Highcrest Park Second <br />Addition. <br />PF 11 -010 RCA 04251 Ldoc <br />Page 2 of 7 <br />