Laserfiche WebLink
........ ... <br />. ............ <br />A <br />............. <br />. .. .. .. <br />W <br />........... .. <br />.............. <br />..................................................................................................... a.a�.n�.n�.n�.n�.n�.n�.n�.n�.n�.n�.n�.n�.n�.n�.n�.n�.n�.n�.n�.n�.n�.n�.n�.n�.n�.n�.n�.n�.n�.n�.���.���.���.n�.n�.n�.n�.n�.n�.n�.n�.n�.n�.n�.n�.n�.n�.n�.n�.n�.n�.n�.n�.n�.n�.n�.n�.fl�.���.���.���.���.���.���.���.���.���.���.���.���.���.���.���.���.���.���.n�.n .................. <br />. .............................................. .. ................................................................................................................................................................................................ .................................................................................................................................................. <br />RepoT'I[s & Recommendation-im- <br />ORIGINATING DEPT./DIV.: <br />ITEM NO.: ITEM DESCRIPTION' Feaslity studies for Pro3ect SS-W-P-81-14 <br />Oakcrest Avenue from Hamline to Lexington, Project W-P-80-32 <br />Paving of Brooks and Transit, an MSA road from Lexington to <br />Aictorizf, - Ptolett- Storm- --S-e- w--eir--Ye-tween Lexington and <br />Victoria, south of Central Park., and Project P-82-5., Repaving <br />of Aglen from Brooks <br />• Transit,, <br />MEETING 2/8/82 <br />DATE'm <br />TEPT. HEAD APPROVAL. <br />6/ <br />In the past., the Council has requested that feasibility studies be done for several <br />colrojects, These feasibility studies have now been completed, and are as follows,, <br />81-14 The reconstruction of Oakcrest Avenue from Hamline Avenue to <br />Lexington Avenue as an NISA roadi,.Yay. <br />W-P-80-32 The -reconstruction of Brooks from Lexington to Transit and <br />Transit from Brooks to Victoria as an MSA roadway. <br />ST-80-30 The construction of a storm sewer system to serve the area <br />between Lexington and Victoria south of Central Park to Grandview <br />Avenue, <br />P-82-5 The reconstruction of Aglen Street from Brooks Avenue to Transit <br />Avenue, <br />kE-COMMENDED COUNCIL ACTION: Adoption of a resolution receiving the feasibilitym <br />report and calling for a public hearing on March 8., <br />1982 for Project SS-W-P-81-141, <br />