Laserfiche WebLink
ACTION REQUESTED: <br />PLANNING CONSIDERATIONS: <br />M ■ <br />A � MOM <br />Paul Carlson (Carlson Equ_lpment Companyi <br />SOUth of Burlington Northern Tracks, <br />South of County Road C Between Hamlir&4, <br />znd Snelling (see sketch) M <br />Variance <br />■ Sidewalk Requirement <br />We concur with the Carlsons with respect to the problems of building a <br />idewalk in this location. As the Staff, however, we do not have authority <br />si <br />to release them from the obligation. <br />The problem with the team track is that on fairly frequent occassions, <br />trucks (many times semi-trucks) will unload from box cars spotted on the <br />siding. These trucks sometimes back over the curb on County Road C <br />itself and frequently park on portions of the area where the sidewalk <br />would normally be constructed. <br />There is also the question of whether a -sidewalk should be built on this <br />side of county Road C. As you know, the County and theh City plan to - extend a hikeway along the north side of colLinty Rte '-3-d C (continulng the <br />pathway already completed on portions o the right -Of -way to the east) <br />A portion of this system, of course, pa-ssps directly in front of City Hall. <br />3* The pre rience and use of the teem <br />01,-)n the con.strilcti( .1m track it�self, constitute-s a problem <br />_)n <-)r tfie- sidewalk a.1(_)n(-%- Tbis team track is <br />the only one in the area,, cIT'd F;023-vos s-upplierst contractors, and others <br />in Foos evillo cirl(I Tarts of surround irig communjtj(!,,:;. Idea.11y, the team track <br />Parking area Should be curbod and raST+,L11te_d F;o as to confine the trucks to <br />