Laserfiche WebLink
M TI �3 R <br />P-RO TER 'FY. DE-orCS RTFTION <br />I "'ODE NO, <br />10 <br />j <br />REM, L= 0 0 <br />IGII%JP,-L <br />OUST CIL <br />AS E" E IS S PE, IITT <br />R E, V IEDI 0 N <br />---�-14,9056Zft. <br />-�9,53 r-I <br />$8,466.38 <br />$5,413,04 <br />11638,13 <br />1r047,35 <br />11414-54 <br />904,40 <br />476,98 <br />304,96 <br />2,206.03 <br />11410.,44 <br />TOTALS: $141202,06 <br />$9.r080.19 <br />The assessment change is based on 20% over the feasibility report cost of <br />per foot. The total construction cost was reduced by the amount <br />received from State Aid Funds which allowed the assessment'amount to be <br />reduced and still receive over 20% by assessments.. <br />R -E-j <br />Co 0 X -I -U 41 !,, D P - T 10 N S <br />