My WebLink
|
Help
|
About
|
Sign Out
Home
1980_0428_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1980
>
1980_0428_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2012 3:17:44 PM
Creation date
1/30/2012 3:16:01 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'MI Mill,60 A�ONLAI <br />AGENDA SECTION'. !,ORIGINATING DEPT./DIV.: <br />-REPORTS AND RECOMMENDATIONS <br />PUBLIC WORKS <br />ITEM DESCRIPTION. Bids for three City Projects: -P-79-1910 <br />SS-W-79-20, and SS-W,79-22 <br />DATE: <br />1EPT. HEAD APPROVAL. <br />\J 44 <br />MG13.40VIEWED/ RECOMMENDS: <br />The Ci iY recently recei ved bids. for the 1980 contract "A", which contains <br />three (3) City projects. They are P-19-19, Oakcrest from Western to Cohansey; <br />SS-W-79-20, atility extensions on Wagner from Western deadend to Wagner deadend; <br />SS-W-79-22, Farrington from Roma to Dionne. <br />There were seven (7) bids received ranging from $60,600.00 to over $83,000,,00, <br />The low bidder was from Bituminous Consulting and Construction at $60,632,80, <br />This is almost $1,500 under the engineer's estimate. The engineering department <br />has reviewed the references of the low bidder and has found them acceptable., <br />Aecommended Council Action: Adoption of a resolution declaring <br />Bituminous Consulting and Construction <br />to be the low bidder for City Improvements <br />P*-79-19, SS-W-79-20 and SS,-W-79-22 in <br />the amount of $60,632.80'and accepting <br />their bid. <br />
The URL can be used to link to this page
Your browser does not support the video tag.