Laserfiche WebLink
2, The cost of the construction of the Interconnection <br />will include construction costs, engineering costs? attorne # .s <br />fees, and other costs related to the interconnection. The <br />total costs are estimated to be $7f500-.00. The total costs <br />will be split equally between the cities. Roseville agrees to <br />pay Little Canada its portion of these cos is within thirty <br />plays of receipt of an invoice by Little Canada <br />3. Each city agrees to the interconnection of the grater <br />systems of both cities to allow each 'ci ty to use the capabilities <br />of the other water system to provide emergency water service <br />within each city, In the event it i s necessary to use the other <br />city's water system, the city requiring emergency ' use shall notify <br />the other city's administrative staff or Public 'Works Department <br />within a reasonable time prior to use, if possible <br />4 There shall be no charge to either city for use of water <br />from the other's water system. <br />51 Maintenance costs relating to the interconnection e i <br />p p <br />and valves shall be split equally betwedn' the cities <br />Each city shall be responsible for the operation and <br />maintenance of its own water system. <br />79 The interconnection between the cities systems shall <br />be constructed pursuant to plans and specifications, as approved <br />by the respective city engineers. Inspection of the construction <br />of the interconnection shall be provided by the Little Canada <br />city engineer. <br />81 The term of this agreement shall be for a p eriod of <br />one year from the date first written above, the month and <br />0"2 <br />