Laserfiche WebLink
AGENDA SECTION' ORIGINATING DEPT./DIV.', <br />REPORTS AMD RECOMMENDATIONS PUBLIC WORKS <br />NO. ITEM DESCRIPTION' <br />CHANGE ORDER NO, 1 FOR 1982 IMPROVE - <br />MENTS, CONTRACT H <br />MEETING <br />DATE: <br />Il/8/82 <br />DEPT, HEAD APPROVAL, <br />opo e LO <br />MGR. REVIEWED / RE <br />Earlier this year, Austin P, Keller Construction Company was <br />awarded the contract for the reconstruction of Brooks and Transit <br />Avenues, from Lexington to victoria, and the construction of a <br />storm sewer for that same neighborhood, The outlet to the storm <br />sewer was into Central. Park near victoria and Transit, where a <br />pond in g facility was created to provide treatment to the storm <br />water before it flowed into Bennett Lake, Frior , to construction, <br />numerous meetings were held With property owners adjacent to the <br />pond area . to discuss potential impacts to their property as result <br />of the pond location, It was ultimately decided, that the pond <br />should-be relocate. approximately 80 feet north of the plan loc a- <br />tion, and that earthern berms separate the backyard areas from the <br />pond proper.. <br />Since this change has required additional volumes of earth to be <br />moved a further distance and additional work performed to construct <br />the berms, the city has negotiated a change in the unit price fro <br />$2.12 per cubic yard to- -$3.17 per cubic yard. This results in an <br />increase in project costs of $22,593.92, which is approximately the <br />amount estimated . at the time of the contract award, <br />In addition to the above change, two adjustments were required to <br />existing city utilities i.n conjunction with storm sewer installa- <br />tions. one was the relocation of a hydrant near 1063 West County <br />Road B-2. The second-was the adjustment of the sanitary sewer at <br />the corner of Chatsworth and Brooks. Prices to accomplish this <br />work have been negotiated for $2,984.27 and $2,935 ;1 respectively* <br />RECOMENDED ACTION: Approval of a motion authorizing the Manager <br />and the Public Works Director to sign Change <br />Order No 1 for the 1982 Improvements, Con- <br />tract B. in the amount of $28,513.50, bring- <br />ing the total contract to $518,889,10, <br />