Laserfiche WebLink
= ­_Zr�: . .......... ........ <br />..... ..... . <br />...... ...... ... ... <br />...... .. <br />::.. I L..Nm <br />..... ...... .I ... ... <br />........................ .. I ... <br />....................................................... <br />............ ................................ ................................ . ................................ . ....................................................... <br />...................................................................................................... <br />i <br />AGENDA SECTION' 'i.ORIGINATING DEPT./DIV.: <br />i <br />i <br />i- <br />A <br />i <br />i <br />REPORTS AND RECOMMENDATIONS <br />PUBLIC WORKS <br />ITEM DESCRIPTION. <br />LEXINGTON AVENUE PATHWAY BID9 <br />MEETING <br />DATE'. <br />1 lZa2.Z8 2 _4Z <br />DEPT, HEAD APPROVAL, <br />-rhe Mn/DOT staff downtown is still in the process of reviewing the <br />final plans At this time. It will be necessary for them to approv <br />these plans before the actual award takes place.but we have been <br />advised that that would be done prior to December 17. It is desir <br />able to have the contract awarded before the end of the year to en <br />sure the Mn/DOT funding of the project. I <br />RECOMMENDED ACTION: Adoption of a resolution authorizing the <br />advertisement for bids for the Lexington <br />pathway identified as Project M-80-4 for <br />9:30 a.m., December 17, 1982W <br />