Laserfiche WebLink
Mug, <br />AGENDA SECTtON. 10RIGINATING DEPT./DIV.: <br />Public Works Director <br />Hearings <br />ednage Outlet- <br />ffEiv, NO.". ITEM DESCRiPTION. West Owasso,, Victoria Drc <br />5"W/ I Project 79-18 <br />JIFEETING <br />91 TE'� 12-17-79 mmmhmb-hh� <br />DEPT. HEAD APPROVAL. <br />C L/ <br />MqR. REVIEWED/ RECOMMENDS: <br />Lr <br />,71�O �Jll <br />Tb further determine the cost involved, actual bids were receiv(�d for the work <br />an October 30, 1979.. Nine bids were received and a as follows: <br />The law bidder is qpproximately $17,000 over the engineer's estimate, but it is <br />reccmTended that these are reasonable bids and, therefore, re-bidding would not <br />0 <br />[#-e in the best interest of the City. The low bidder is an expexienced contractor <br />and if the projeut is approved, it is recomwnded that he be awarded the contract!. <br />In an effort to determine any other problens- that Tnay occur,, contacts were rnade <br />with- Rarsey County, the U. S. Corps of Bagineers, and the DNR to get their <br />recation to the project. None had any particular objedtion and all necessary <br />perrats have been obtained. In addition, contact was rade with all of the property <br />owners who would be directly effected by the construction activities in Roseville, <br />miwd all easements have -been obtained. <br />[�btion approving the construction of a joint Shoreviervy/ <br />Roseville Storm Drainage outlet for the pond at the <br />north end of the Nillwood cul de sac, identified as <br />Roseville Project No. 79-18. <br />Resolution accepting the low bid of Bonine Excavating, Iric'. <br />in the amount of $151,589.50 for Pro3ect No. 79-18. <br />Motion -authorizing the Mayor and bbnager to. sign earnest <br />mney contracts to acquire pexmanent easemnts 1 thru 14 <br />and temporary easexnents 1A thru 14A for parcels 1 thru 14 <br />of Improvement 79-18. <br />