Laserfiche WebLink
MEET{NG <br />REQUEST FOR COUNCIL ACTION DATE z�/19/79 <br />Afro NlEF A St C T1 O N : OFD: GIN ATI; G DEPT, /01 V. . <br />ITEM NO, <br />E--- 1.3 <br />DE P r HEAD APPROVAL. <br />OF. S%` � PTI ON. B I D S FO.R PROD ECT 79 - 8 A L TA V I STA , 7 9 - L E X 11`ti i - MFR_ REV I.E RECO NOS <br />TOM & OXFORD AT CO. RD. B-2 AND 79-14 FOR HAMLINE-'AVE, <br />r <br />On Sept. 51 1979, the i received i for 3 proi t ��aY wore rur a sanitary sewer <br />to serve a new p 1 at an Alta Vista Drive identified a 55-79-8; paving, cu'rb and gutte r� , <br />sanitary s ewer and Ovate r ma i ns to serve the new Michels plat an the northeast corner of <br />Lex i ngtoo and Co. Rd, D- 2 i dent i f1 ed 's Pr of . 79 - 3; and a s to r m sewer to serve a parcel <br />owned by Michels CDnstructj an on the west side of Haml ine Avenue north , O-F Oa kcr est i doa - <br />ti fi ed as ST-79-14.. Only one bid was received for the impr oveuie nt and that being fro-in <br />Ro- So Coottactirg incorporated, <br />The Alta Vista pro eo l�. was bid in two forms by .A 1 ter nate bids. The first was to construct <br />the line along Alta Vista and tunnel under a St, Paul main at a hid price of $30m122.35. <br />This was considerably over the engineer's os ti mate by approximately $18,D00.0D, l ter- <br />n u Le B was to take tie sanitary sower southerly to P i nevi ew Court with that bid being <br />$17#418,50 vs the engineer's estimate Df $16,727.00. This route, however, proves to be <br />a problem in that none of the property oviners along Pi nev i ew Court were , n Dt agr eeab .e to <br />prov i (ii ng utility easement across their property for the sewer construction. A delay, <br />there-fore, had occurred while a tte rip Ls were made to find yet apother alignment where <br />eas ome nts could be secured. This has now been achieved over* the extremely long parcel <br />owned by the Sch l os s2 r family that goes all the way to i)a l o St. The owners of the plat <br />have been contacted and a r 2 agreeable to the realignment. Also , the contractor has-been <br />cart ao tell and i's agrec�abl a to a change ar der to rn'odify his proposal to conform to this <br />new 1 acati on , The work is 8 ti 1 l expected to occur~ this year. the RMOT]nt Df work , i n- <br />c l ud i n g the Change Order occu'rrod , would result in a bid price of $19,X54,90. Consider- <br />ing the fact that the number of lineal �cet of sanitary sorer be constructed a 1 ang <br />the new plan is 933 feet ,or a 1Tr.os t 60 g mater^ than th o 571 original feet, this <br />seerps quite reasonable. the appropriate action would, therefore, be to accept bid for <br />Al Ler n ate 8 for this praj ec L and then execute Change Order No. 1 to cover the real i qn - <br />men t <br />The second Prof ect at Co - Rd, H - 2 for, Lex i ogtori a ad O fo rd has a bi d of 43 � 728. 10, kph i ch <br />is well over the engineers esti rate of $35,600.00. The owners were contacted on this <br />and it was their opinion that they pro -ul d rather wait and have the project rebid th i s <br />winter for cGnstruoti oa next year wji th the hope that by d-a i ag it at that time, pia re com- <br />petition and bidders would be achieved and , therefore, a lower price <br />The last prajcct Ova 5 for the storm sewer on Ham 1 i oc Avepue 79--14 where, once again, <br />the bid of $16,222.00 Oval well over the engineer's estima-te of $12,794.00. Again, <br />Michels Construoti an WaS contacted and they preferred to have the project r eb i d this <br />winter, hoping fur mDre competition and lower prices. <br />RECOMMENDED ACT Y DN <br />(1) Adapt-ion v f a resolution accepting aid on Project SS -79- -8 Alta Vista Drive for <br />Alternate 8 in the aMaa of of $17,418.50 i• rGm Ra- So Contracting, Ipoorpora tell <br />(2) Re j ecti oo of bids -of Sept, 55' 1 979 for Pr of . SS -W- P -79 -3 for Co. Rd. Rye and <br />Oxford and authorizing the r eadvert i samara fo bid for the 1 980 construction <br />sea Son . <br />(3) Igo j ec-t on of bids received Sept . 51 1979 for Prof. ST-79-14 on Rani i ne Avs . and <br />authori z i rig the readvertisement of bid for the 1 980 construction soascln . - <br />(4) Notion a pprnv i rig : Change Ordo r No. 1 for Ro- o Contracting in the amount c <br />$2,235.50 for real i gn.i rag and extending the sanitary sewer for Prof. SS-79-8 <br />for Alta Vista Drive * <br />(5) Approval oval of a nation a uthGri z i ng the mayor and the manager to sign are earnest <br />money contract for Ea � emea t No. 1, P ra j. 79-8 in are arrlaun t of $5,0130.00. <br />