My WebLink
|
Help
|
About
|
Sign Out
Home
1978_1204_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1978
>
1978_1204_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2012 3:40:10 PM
Creation date
2/6/2012 3:35:16 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXECUTIVE OFFFCES.- <br />1435 INKSTER 13OULEVARD <br />WINWE4, MANITOBA <br />!R2X 1R2 <br />(204) 633-"22 <br />CHAMPS FOOD SYSTEMS LTD* <br />Mr. S teve North <br />Assistant City Manager <br />2660 Civic Center Drive. <br />Roseville, Minnesota <br />tj,S,A.m 55113 <br />Dear Mr. North: <br />November 30, 1978 <br />A review of our file Indicates that the Special Use Pexmit <br />app-roved by the Roseville City Council at its June 12, 1978 meeting <br />expires on December 12, <br />Please accept this letter as an application to have the pexmit <br />renewed until December 31, 1979* <br />We ,-have applied fore,--renewal of f the Liquor- Licenses by separate <br />letter, and I understand that you are Processing that part of the <br />renewals dealing with 2350 Cleveland Avenue. <br />The following information is provided to generally update' you <br />T:n the status of the pro ect and to support the Applicat n for Renewal <br />2.0 <br />The Roseville site acquisition was finalized and we closed with <br />Dayton Hudson during the last week of Octobier, 1978, <br />2, Construction at Roseville is being delayed until 1979 due to an <br />upgraded cha.nge in the -building �lan.st and in omder to have con.., <br />0 <br />struction co-incide with.another site to be located near France <br />and 494 in Bloomington,, <br />3* The upgraded plans for the restaurant are currently being finalized <br />by our architect,, and Mr. Stahl will submit revisions when you <br />require same, The changes do not-alter the dimensions of the <br />building nor the site plan. <br />4. The situation in Bloomington is proceeding very well on the basis- <br />of a planned unit develoipment,, and we anticipate that' we should be <br />able to get construction undezvay sometime during the summer of 1979. <br />00 60/2 <br />A <br />MOrHER TUCKER'S V <br />FOOD EXMAIENCle <br />ON <br />EXECUTIVE OFFFCES.- <br />1435 INKSTER 13OULEVARD <br />WINWE4, MANITOBA <br />!R2X 1R2 <br />(204) 633-"22 <br />CHAMPS FOOD SYSTEMS LTD* <br />Mr. S teve North <br />Assistant City Manager <br />2660 Civic Center Drive. <br />Roseville, Minnesota <br />tj,S,A.m 55113 <br />Dear Mr. North: <br />November 30, 1978 <br />A review of our file Indicates that the Special Use Pexmit <br />app-roved by the Roseville City Council at its June 12, 1978 meeting <br />expires on December 12, <br />Please accept this letter as an application to have the pexmit <br />renewed until December 31, 1979* <br />We ,-have applied fore,--renewal of f the Liquor- Licenses by separate <br />letter, and I understand that you are Processing that part of the <br />renewals dealing with 2350 Cleveland Avenue. <br />The following information is provided to generally update' you <br />T:n the status of the pro ect and to support the Applicat n for Renewal <br />2.0 <br />The Roseville site acquisition was finalized and we closed with <br />Dayton Hudson during the last week of Octobier, 1978, <br />2, Construction at Roseville is being delayed until 1979 due to an <br />upgraded cha.nge in the -building �lan.st and in omder to have con.., <br />0 <br />struction co-incide with.another site to be located near France <br />and 494 in Bloomington,, <br />3* The upgraded plans for the restaurant are currently being finalized <br />by our architect,, and Mr. Stahl will submit revisions when you <br />require same, The changes do not-alter the dimensions of the <br />building nor the site plan. <br />4. The situation in Bloomington is proceeding very well on the basis- <br />of a planned unit develoipment,, and we anticipate that' we should be <br />able to get construction undezvay sometime during the summer of 1979. <br />00 60/2 <br />A <br />MOrHER TUCKER'S V <br />FOOD EXMAIENCle <br />
The URL can be used to link to this page
Your browser does not support the video tag.