My WebLink
|
Help
|
About
|
Sign Out
Home
1978_1218_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1978
>
1978_1218_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2012 3:47:06 PM
Creation date
2/6/2012 3:43:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGENDA SECTION <br />REQUEST FOR COUNCIL ACTION °ATE 12-1e-78 <br />ORIGINATING DEPT./DIV.: <br />DEPT. HEAD APPROVAL. <br />a <br />imports & cmmndations Adrn <br />I ITEM NO.: ITEM DESCRIPTION. I �` MGR. REVIEWED/ RECOMMENDS: <br />inclucled in the 1978 budget are appropriations to make certain iripr is to the <br />Ice Arena. � Council's b t action was the result of an erg. ing study � <br />report to correct the frost heaving problem of the ice sheet <br />e solutes � approved provided for the thawing out the frost, lower- <br />ing the main header and installation of the under floor heati ci system and insulation. <br />The estimated cost for the basic solution is $106,400. In arleli on,, other e r <br />sawing solutions were reconrnanded which would cost an esthmted $9,60,0. The estizated <br />dawn time for these inproverrents is A =nths i <br />At the tirm the engineers report was reviewed by the Council one nenber ash that <br />one der alternative ti investigated which wed provide for layer of sand and <br />nsulation in lieu of the under floor heating system. The engines has prepared a <br />report on that alternative (see attached) # The report, in effect, is reammending <br />against this alternative . These irrProvenients are to be fin n aim fraam General Revenue <br />Sharing funds,, The anticipated schedule is to tale bids in February or at the <br />ear Fliest possible t ,r <br />The Consulting Engineer (jac s , Inc.) has submitted a proposal for the design and <br />inspection of the Iee Arena irrProverrents in the ammt of $5,000. This includes <br />a certain number of hours for p ion, which is belies to be adequate. <br />Action Pequested lib -ion authorizing the City Mxar to sib a <br />letter of'a-greement with Jaous As sociates , Inc <br />to provide engineering services for a.npro 4 is <br />to the Ice Arena <br />
The URL can be used to link to this page
Your browser does not support the video tag.