Laserfiche WebLink
RART "B" <br />,Sub areas <br />11 <br />PHASE III (Field Investigation) <br />Element Xin,din tatus Cost Comrnents <br />Physical survey of Future 550 MR to be $18 � 600 to begin in spring <br />Ms and look at inspected of 1979 <br />sewer line <br />Storm sewer flooding Future 201000 LF to 53,600 to begin in Sept <br />be flooded of 1979 <br />Smoke testing Future 100,000 LF to 113,000 to begin in Sept. <br />be tested of 1979 <br />Clean sewers for Future 40000 U to 21,300 to begiu in Sept. <br />TV work be cleaned of 1979 <br />TV Future 409000 LF to 23,500 to begin in Sept. <br />be televised of 1979 <br />r3stimated final cost of Phase 111 $30200* <br />