Laserfiche WebLink
j!�GF.-' DA 5EC1 i r I P 4 <br />MEETING <br />REQUEST FOR COUNCIL ACTION ATE �14-79 <br />------- <br />ORIGINATING DEPT_ /DtV. : <br />ITEM N(), E r4f. f. F_ ' � C R= PT 10 Change der No, 4 - Project 77--3A <br />J?51— / 3 <br />DEPT. HEAD APPROVAL. <br />6, u- (i;/ <br />MgFiks, REVIEWED/ RECOMMENDS'. <br />Hellai,r Construction and George Reiling are the owners of undeveloped 'Land West <br />of <br />:Lexington Avenue bet4een Co t ad - C-2 and Josephine lid* The Bellair <br />plats have developed earliest and approval has been given for that portion of land. <br />The southerly portion nearest County Road C-2 and - those lots directly , fronting <br />Jose hire goad have had a contract awarded for the placeniEmt of streets and utili -Lies <br />either now or in the past. As part of this work is necessary to extend the water line <br />between County Road C-2 and josephine Road along what will eventually be Fern. A enue . <br />The city has an existing sanitary sewer lift station and wet well at that location# <br />however f and it has been found that the manholes for these facilities need to be <br />raised to avoid storm water ruuni.ng into them and potentially cans inch flooding. This <br />would oc r because the work will result in � .and now bei.ng higher than the existing <br />manholes. <br />To correct this, the contractor has been - approached to adjust these structures and <br />has submitted a proposal in the ar unt of $2,011,00, This has beery reviewed by the <br />City's consulting engineers, short Elliott and Hendrickson? and the engineering staff <br />and found to be acceptable. <br />Recommnded Ce cil Action: t�.on appro ng the Mayor and City manager <br />to± ,: 5 ign Change Order Nb , 4 on Pro j 6ct 77-3A <br />in the amount of , 013, for the adjustment <br />of an existing sanitary- sewer lift station, <br />entrance and wet wells <br />