Laserfiche WebLink
MEETING .5-21-79 <br />REQUEST FOR COUNCIL ACTION DATE'----- <br />an April 23, 1979, the City received a feasibility study for the construction of paving, <br />storm drainage, sidewa , in conjunction with the proposed construction by the State <br />of the Snelling frontage road on the east side of Snellinq from County Pcad C-2 southerly.. <br />At that tirrie a public bear'imng was ordered for May 21, and the fol-lowinq is the recoprriiei�ed <br />procedixre for this hearing*. <br />A. Mayor calls the hearing by annomc-ing the foliowiiig�: <br />SS-Vf--P-SW-79-4 East i9nelling Service Drive fran County Road C-2 to <br />1200 feet north of County lbad C <br />Mayor requests presentation of legal notice by Flanager <br />V <br />C. Public T�brks Director presents suarary of nature of i'zprovenent, - area xnvalved- <br />wtoi -wowst estimate. <br />Recormnnded Comcil Action: 1) Adoption of resolution ordering ro en] <br />V <br />ST-147-P-S7A7-79-4, Snelling and. C-2 area and <br />P P1 <br />authorizing the preparata-on of fina p <br />l l-aans. <br />F <br />Adoption of a resolution approviing the 'plans for <br />the construction of the service road on the east <br />side of Snellinq Avenue from 250' north of Count <br />y <br />Poad C-2 to 1320' south of County Road C-2. <br />3) Authorize the City to enter into a corporative <br />aqreerrent v�ith the State to- have- them. achieve the <br />construction of said. pro"ect 6216-83 (Sl=125) also <br />known as City Project 79-4. <br />