My WebLink
|
Help
|
About
|
Sign Out
Home
1979_0827_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1979
>
1979_0827_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2012 9:21:05 AM
Creation date
2/8/2012 9:18:25 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ng" <br />..... .... .. . . .. .. ... . <br />.. .. ... .. ... ... ... . <br />.. .. ... . .. .. . ... . <br />. .... .. .. .. .. ... . <br />... .. ..... .. . .. .. ... . <br />�22 <br />. . . .. .. <br />.... . ... .. <br />I . .. . . .. <br />... .. ... .. .. ... .. <br />.... . ... .. ... ... .. ... . <br />..... .... <br />. ... .. ... ... .. <br />.. .. .. . .. <br />.. .. . .. . . .. <br />.. . .. .... .... .... ....... ............. .. ...... . ............ ...... <br />i.A.: . . ........ .......... <br />.. ...... --- <br />. ................... .................... <br />MEETING 8-27 -79 <br />DATE . <br />e construction of County Road C--2 between Albert and Sheldon, it was f6und <br />to be desirable to m.xU the plan for the roadway elevations This Was to provide <br />rare po <br />sits. drama for a particular paroe1 in the It * therefore,, <br />necessary to replace 712 feet of curb and gutter and adjust the roadway elevation <br />and base. The expezme for this work is $10,900, bringing the total cOntraet to <br />$254,6130 <br />send project • is with C, S, ssan at Gluek bane and Fairview. � of <br />�'he lased for the entrance t <br />the work at this location # a new turn radius is to ] <br />e <br />belle' s site, In oar to properly slope the roadway and have clearance on the <br />side <br />it is necessary to relocate a fire hydrant and some drama . facilities at that <br />radius. The relocation of this fire hydrants l� feet of � noh storm pipe � 6 feet <br />r <br />inch stone i together with other necessary app rtena s , �s to $2,034.14. <br />of l� pipe, � <br />This brings <br />the total of the contract to $19,824,64, Because of the delay in ordering <br />e hydrant parts, an extensim of the completion date to Septexrber 28, has been <br />requested* <br />Reccurcended Council Action: Motion approving Change order No, 1 for <br />Project 78-29 , bounty mad C--2 at Snelling <br />in the amount of $lo <br />Motion approving change order No * 2 for <br />Project 76-20 in the amount of $2,034,14 <br />and the extension of the caqpletion date <br />to Septarber 28, 19'9 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.