My WebLink
|
Help
|
About
|
Sign Out
Home
1978_0424_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1978
>
1978_0424_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2012 10:50:43 AM
Creation date
2/8/2012 10:48:30 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville- <br />April 20, 9 7 8 <br />Page <br />Our work would include the following <br />1. Review of existing installation including discussion <br />with persons previously involved with project, ` <br />2. Discussions with Braun. Engineering Testing to take <br />advantage-of their work and recommendations relative <br />to the thawing and compaction ' of the soil under the ice <br />sheet, (These discussions would be as authorized by <br />the City of Roseville and their costs, if any, would be <br />billed directly to the City of Roseville.) <br />3. Report including recommendations and cost estimates <br />(eight copies to be submitted to City-of Roseville). <br />It is difficult to set an exact maximum for Phase I, how- <br />ever, a similar service provided for the Columbia Arena <br />cost approximately $4,000.00 including our time and the <br />time spent by the architect, we propose to sot a maximum <br />of $3,500.00 for our work and will nbt exceed this maximum' <br />without at authorization from the City of Roseville <br />Yours very truly, <br />RLP /m- e <br />Accepted b <br />CITY OF Res EVILLE <br />B <br />Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.