My WebLink
|
Help
|
About
|
Sign Out
Home
1978_0508_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1978
>
1978_0508_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2012 11:12:54 AM
Creation date
2/8/2012 11:08:35 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ACTION REQUESTED. <br />PLANNING CONSIDERATIONS4 <br />Murlowski and Reiling <br />South of Josephine Road and West of <br />Lexington- Avenue �see attached drawing) <br />a. <br />Approval of' Prel-iminary Plal <br />2. This study is now nearing compl,etion but will likely not be completed and <br />acted upon by the Rice Creek Watershed Board before July 1978. Initial <br />0 0 <br />studies conducted in conjunction with the Roseville staff indicates the <br />construction of 36 inch to 72 inch diameter pipes through the property in <br />question as indicated by the heavy dotted line on the attached drawing.. <br />Rather than hold up the entire project pending completion of the Watershe(7 <br />Study, last summer Mr, Murlowski asked for ar)proval to plat the five lots <br />contiguous to Josephine Road on the north end of hi's property. This <br />Platting was approved with the provision that Lot Five be retained for <br />V <br />pondinq purposes in the event the new storm sewer system 1*s not <br />constructed for some reasonS <br />
The URL can be used to link to this page
Your browser does not support the video tag.