Laserfiche WebLink
<br />~XHIBIT A <br /> <br />Larry Alm-Southwind of Roseville <br />4/28/97 <br /> <br />Sale of Lançl <br /> <br />Additional Dev@loper Co...G! <br /> <br />$141.113 <br /> <br />- $22.000 Road Construction (1) <br />- 11 ,000 Soil Compaction correction (2) <br />6,000 Utility line removal or fi ¡ in (3) <br /> <br />~~->-,_...--._-- <br /> <br />- $39,000 Additional Costs <br /> <br />- 39,000 <br /> <br />$102,113 <br />say $102,000 <br /> <br />(1) Road construction includes approximately 250 feet of new curb, gutter, grading, <br />pavement and utility construction from existing cul-de-sac east. While the developer will <br />vacate a portion of the existing cul-de-sac to create more efficient ¡and use, the <br />developer will also incur the expense of removal of a portion of the existing cul-de-sac <br />and curb Une. <br /> <br />(2) There is soil correction and compaction on the new road extension made <br />necessary by previous fi!ling aiong the edge of the site. <br /> <br />(3) There is one city utility line which must be abandoned and removed from Zeece's <br />Plat lot 4, Biock 1 in order to provide use of the buildable portion of the lot <br />