My WebLink
|
Help
|
About
|
Sign Out
Home
1978_0911_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1978
>
1978_0911_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2012 3:42:44 PM
Creation date
2/10/2012 3:39:25 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S <br />IMMA amp Im CONSULTING ENGINEERS I <br />ST_ PAUL, MINNESOTA 0 r <br />September 1, 1978 <br />Mr. Frank Rog, Recreation Director <br />City of Roseville <br />2660 Civic Center Drive <br />Roseville, Minnesota 55113 <br />Dear Mr. Rog <br />RE: FOUNDATION FOR PARK BLDG i <br />OR FILE No. 78087 <br />Pursuant to our conference on August 24, 1978, we are pleased <br />to submit this proposal letter regarding our engineering services <br />in connection with the foundation system for the 30 x 64 Parkaire <br />Park building. <br />we will do a topographic survey of the area and provide the <br />structural design for the foundation system and prepare a con- <br />struction plan. <br />During the construction phase we will stake the building location <br />and inspect the footing and floor concrete work as well as take <br />compressive strength cylinders and air tests of the concrete. <br />Compensation for preparing the serve f engineering design and the <br />construction plans shall he on the basis of our continuing engi- <br />neering services agreement dated January 16, 1978, This provides <br />for compensation at 2.25 times payroll cost. <br />We estimate the cost of this phase of the work to he .$ 8 5 0 _ <br />The construction phase services described previously would he <br />done only upon your authorization and would he at the rate of <br />salary costs times a multiplier of 2110, <br />We estimate the cost of the construction phase services to he <br />$500* <br />This proposal does not include design or inspection of the <br />structure itself since that is a pre - engineered timber- building <br />nor does it include any electrical work or full time resident <br />inspection. This proposal does include, however, the design <br />work involved with the connection to the existing water and .sewer. <br />Or ij� <br />
The URL can be used to link to this page
Your browser does not support the video tag.