My WebLink
|
Help
|
About
|
Sign Out
Home
2011-05-26_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Grass Lake WMO
>
Agendas and Packets
>
201x
>
2011
>
2011-05-26_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2012 10:39:21 AM
Creation date
2/15/2012 10:37:17 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Grass Lake WMO
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
5/26/2011
Commission/Committee - Meeting Type
Special
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
154 Newly- appointed Board member Barrett requested a clarification on the cost -share program referenced on <br />155 the 2012 budget worksheet for property owners (Line 11, Capital Improvements). <br />156 <br />157 Member Von De Linden noted the number of projects in the Third Generation Plan that cost money. <br />158 <br />159 To elaborate another point, Ms. Correll addressed the "big picture" as it related to the GLWMO <br />160 management responsibilities for Lake Owasso, and the need to address the inflow into Lake Owasso from <br />161 other water bodies whose management falls under the burden of the GLWMO; and how those <br />162 responsibilities could be addressed by the GLWMO and the City, when they were cost - prohibitive, or <br />163 outside the GLWMO purview. Ms. Correll suggested that, over the next ten (10) years, what were the <br />164 BMP's in that Management area that the GLWMO could realistically do, and what the Cities could <br />165 realistically do, without putting more responsibility on them to come up with rain gardens and address <br />166 phosphorus loads; activities that would prove too much for either entity given current budget constraints. <br />167 <br />168 Chair Eckman noted that the southern half of the WMO is part of the watershed for Lake Owasso and that <br />169 wetland was currently overwhelmed and not doing a good job in getting pollutants out. <br />170 <br />171 Ms. Correll advised that, when the 2012 -2013 TMDL study has been completed, (second DRAFT of the <br />172 proposed scope as provided to Board members by e-mail), costs for an in -lake assessment for Lake <br />173 Owasso could be eliminated as the MPCA thought it not fair to other watershed areas not currently <br />174 impaired, and the TMDL will state more specifically where BMP projects would be most effective: in- <br />175 lake or in water body contributors; and then lay out specific activities the GLWMO should address over <br />176 the remaining seven (7) years of the Third Generation Plan. <br />177 <br />178 Discussion included projected deliverables of the TMDL study suggesting an implementation plan <br />179 identifying what types of practices were recommended to address external nutrient loads to Lake Owasso <br />180 and associated cost estimates; anticipated priorities being Bennett Lake and Lake Emily, and then Lake <br />181 Owasso, providing general protection for water bodies north of Lake Owasso; upcoming Storm Water <br />182 Pollution Prevention Plan (SWPPP) review for the City of Shoreview as part of the annual requirements <br />183 under each city's MS4 Permit from the MPCA; and implications of TMDL study results to provide <br />184 direction on how best to allocate funds in the DRAFT (6/2001) Implementation Plan Table (Table 33) and <br />185 how much to ask of members cities, as detailed in the "cost column" in the Third Generation Plan and in <br />186 Section 7.0 (dated 5/2011), distributed by Ms. Correll at the meeting, and attached hereto and made a <br />187 part hereof, reiterating that these were all preliminary DRAFT documents at this point, and once further <br />188 refinements were completed and approved by the Board after the public /agency review period, final <br />189 approval by BWSR, and subsequent adoption of the Third Generation Plan by the GLWMO Board, minor <br />190 amendment may still occur once the MPCA's TMFL study was completed. <br />191 <br />192 Board Members reviewed Table 33 (Implementation Plan Table) and projected goals, priorities, and <br />193 projected annual cost allocations through the ten (10) years of the Plan; potential revisions to Section 5.0 <br />194 (Management Standards — 6/2011 DRAFT) for responsible parties for management of specific items; <br />195 comparisons with how other WMO's allocate their BMP costs, rather than WD's; with Action Step Mr. <br />196 Petersen directed to research that information and e -mail it to Board members for their review. <br />197 <br />198 On Table 33, page 2, Mr. Schwartz noted references to water quality improvements projects from 2015 — <br />199 2021 at approximately $6,000 - $7,000 annually, with the proposed city cost share at 50 %; and questioned <br />200 what types of projects were anticipated. Mr. Schwartz opined that, in general, the numbers indicated on <br />201 the table seemed small in comparison to actual costs incurred for this type of BMP project. <br />202 <br />203 <br />204 <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.