My WebLink
|
Help
|
About
|
Sign Out
Home
res_10285
Roseville
>
City Council
>
City Council Resolutions
>
10xxx
>
10200
>
res_10285
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 9:25:33 AM
Creation date
5/13/2005 4:37:49 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Resolutions
Resolution #
10285
Resolution Title
AUTHORIZING CONTINUATION OF THE CONTRACT FOR EXCLUSIVE NEGOTIATIONS BETWEEN THE CITY OF ROSEVILLE, MINNESOTA AND THE ROTTLUND COMPANY, INC. FOR THE TWIN LAKES REDEVELOPMENT AREA
Resolution Date Passed
3/14/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />TWIN LAKES, Roseville, Minnesota <br />Market Assessment & Demand Analysis <br /> <br />Condo-Townhouse Market Assessment <br /> <br />DEVELOPMENT PIPELINE <br /> <br />GV A Marquette Advisors contacted city planners to identify residential development projects <br />tbat are currently under construction, planned or proposed in the Twin Lakes competitive market <br />area. We identify herein a group of projects expected to come online during the short-term <br />(within 2 years), as well as long-term projects, or those still in the conceptual planning stages and <br />tberefore somewhat undefined. <br /> <br />Short-Term Projects (1-2 years) <br /> <br />In addition to the 75 units currently under construction or in pre-construction marketing, <br />we identified another 245 for-sale (non-senior) planned housing units are expected to come <br />online during the coming 24-month period. The short-term development pipeline includes <br />five small projects in the city of Roseville, plus Twin Lakes, along with another large <br />redevelopment project in St. Anthony. Each of these projects are mapped below and described <br />in the paragraphs that follow. <br /> <br />Short-Term Development Pipeline (1 to 2 years) <br /> <br /> <br />GV A Marquette Advisors <br /> <br />Page 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.