My WebLink
|
Help
|
About
|
Sign Out
Home
CC_Minutes_2005_0516
Roseville
>
City Council
>
City Council Meeting Minutes
>
200x
>
2005
>
CC_Minutes_2005_0516
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 9:26:04 AM
Creation date
6/8/2005 9:45:01 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Minutes
Meeting Date
5/16/2005
Meeting Type
Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City Council Study Session - 05/16/05 <br />Minutes - Page 12 <br /> <br />Councilmember Schroeder suggested another source for staff to <br />contact regarding planting materials (i.e., Ramsey/Washington <br />County Corrections Department). <br /> <br />Discussion included allocation of funding from the City's <br />Stormwater Utility Fund; and agreement of homeowners for <br />future maintenance of a 20' buffer. <br /> <br />County Road B/Cleveland Landscape Planting <br />Ms. Bloom noted that residents had approached the Minnesota <br />Department of Transportation (MnDOT) to install various plant <br />materials (i.e., lilacs, shrubs and vines) along a fence line <br />between the freeway off-ramp and private properties. Ms. <br />Bloom noted that this would include Buckthorn eradication, and <br />was to be an Eagle Scout project, with planting to begin in early <br />June of this year. Ms. Bloom noted that the City's participation <br />would include tilling the area; providing hauling of planting <br />materials and compost, with labor for installation and annual <br />maintenance to be provided by the neighborhood and Boy Scouts <br />with MnDOT providing the plant materials. <br /> <br />Discussion included future construction plans at that intersection, <br />with no disruption anticipated when signal work is begun and <br />additional turn lane installed. <br /> <br />Bayview Drive <br />Ms. Bloom noted that this is a partnership between the City and <br />property owners in a private drive along Lake McCarrons, <br />involving five homes and attempts to stabilize a private driveway <br />and redirect drainage through regrading of the private drive and <br />directing storm water toward South McCarrons Boulevard and <br />into an existing sedimentation trap to eliminate direct discharge <br />into the lake. <br /> <br />Discussion included proposed cost for the City's portion and <br />concrete gutter (estimated at $12,000); location of wetland; <br />source of funding from the City's Storm Water Fund; and <br />NPDES credits. <br />
The URL can be used to link to this page
Your browser does not support the video tag.