My WebLink
|
Help
|
About
|
Sign Out
Home
res_10315
Roseville
>
City Council
>
City Council Resolutions
>
10xxx
>
10300
>
res_10315
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 9:26:26 AM
Creation date
7/1/2005 11:07:41 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Resolutions
Meeting Date
6/20/2005
Resolution #
10315
Resolution Title
RESOLUTION RECEIVING FEASIBILITY REPORT ON S. OWASSO BOULEVARD RECONSTRUCTION PROJECT AND ORDERING PUBLIC HEARINGS
Resolution Date Passed
6/20/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />EXTRACT OF MINUTES OF MEETING <br />OF CITY COUNCIL <br />CITY OF ROSEVILLE <br />RAMSEY COUNTY, MINNESOTA <br /> <br />Pursuant to due call and notice thereof, a regular meeting of the City Council of the City of <br />Roseville, County of Ramsey, Minnesota, was duly held in the City Hall at 2660 Civic Center <br />Drive, Roseville, Minnesota, on Monday, the 20th day of June, 2005, at 6:00 p.m. <br /> <br />The following members were present: Kough, Ihlan, Schroeder, Maschka and Klausing and <br />the following members were absent: none. <br /> <br />Member Maschka introduced the following resolution and moved its adoption: <br /> <br />RESOLUTION NO. 10315 <br />RESOLUTION RECEIVING FEASIBILITY REPORT ON <br />S. OW ASSO BOULEVARD RECONSTRUCTION PROJECT <br />AND ORDERING PUBLIC HEARINGS <br /> <br />BE IT RESOLVED by the Council of the City of Roseville as follows: <br /> <br />1. By resolution adopted October 25,2004, the Council directed the City Engineer to <br />prepare preliminary reports as to the feasibility of the proposed improvements: <br /> <br />S. Owasso Boulevard Reconstruction (between Rice Street and Dale Street) <br /> <br />2. The City Engineer was also directed to include in the report the estimated cost of the <br />proposed improvements. The preliminary report and cost estimates have been submitted <br />and considered by the Council and are hereby approved and directed to be placed on file <br />in the office of the City Manager. The improvements proposed to be made in the general <br />manner set forth in the report are designated as Improvements P-05-06, S. Owasso <br />Boulevard Reconstruction. <br /> <br />3. The Council shall meet at the City Hall, 2660 Civic Center Drive, in said City, on July <br />11,2005, at 6:00 p.m. for the purpose of holding a public hearing on the proposed <br />improvements under and pursuant to the provisions of Minnesota Statutes, Chapter 429, <br />and the Manager is hereby authorized and directed to cause notice of the time, place, and <br />purpose of that meeting to be published twice in the official newspaper, Roseville <br />Review, which publications shall be a week apart, and the second publication shall be not <br />less than three days before the date of the hearing. <br /> <br />4. The notice shall be in substantially the following form: (see attachments). <br /> <br />5. The general nature, estimated cost and area proposed to be assessed for Improvements P- <br />05-06, S. Owasso Boulevard Reconstruction.are determined to be as stated in the <br />foregoing notice, as fully as though the same were separately set forth and resolved <br />herein <br /> <br />The motion for the adoption of the foregoing resolution was duly seconded by Schroeder and <br />upon vote being taken thereon, the following voted in favor thereof: Kough, Ihlan, Schroeder, <br />Maschka and Klausing and the following voted against the same: none. <br /> <br />Whereupon said resolution was declared duly passed and adopted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.