Laserfiche WebLink
AGENDA s�cria�v : <br />R���r�,i S �1:lD R"tC�}i���^��VDaTI��(1S <br />MF£T]NG <br />������� ��� �������.. ������ oarE: 9 _20/76.� . <br />ORIGINATiNG OtPT./DIV,: <br />PU�;LIC �.lO��:S <br />i�..� NO.: 4TEfvl OESCRIPFION' <br />�IDS FOR PROJECT 75-TO <br />r- - � <br />� <br />c <br />DEPT. 1-IEAp APPR�VA�_ <br />--' �I / �:! j''�� <br />MGR_ REVIEWEp/RECOMMENOS= <br />�n September 10, ]976, the c�ty received bi�s for Praject 75-1Q which <br />is the reconstruction of a M7nnesota �ransfer Raiiway crossing located <br />�n Terrninal Road, jus� west of BoiSe Cascade Paper Campany. The lo� <br />bi�der was F. P9orettini Constructian Com�any with a bid of $7,997.00. <br />Three bids were rec�ived from the six c�nstruction -Firms that had re - <br />quested plans and specifications. They ar� as follo�+rs: <br />e <br />F. Morettini Construc�ion Conpany <br />J"& T Gontracting <br />$ 7,397.00 <br />]1,522.38 <br />V�ctor Carison & Sons, Inc. 13,872.00 <br />The bids ranged from �7,997.00 to a high o� $�.3,872.00. <br />F. Morettin� Corapary.presently has two con�racts �v-ith t�e city for street <br />and utilities work and is doing a satisfactory �ab. <br />REC4h9ME�lDED ACTIO«: �Au�rard ifie contract for Project 5T--75-10 �o <br />F. P�oretti ni Constructi on Company -�or thei r. <br />3ov�� bid of $7,997.00, <br />