My WebLink
|
Help
|
About
|
Sign Out
Home
2012-02-28_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2012
>
2012-02-28_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2012 9:02:44 AM
Creation date
2/23/2012 8:56:41 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
2/28/2012
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. <br />following construction of the roof, with remaining exterior and interior concrete <br />work needed in the spring, including baffle wall construction. <br />Member Stenlund recognized Pulte Homes for their care in stabilizing their <br />construction site for the winter at County Road C -2 and Lexington Avenue; and <br />expressed his appreciation for the quality of their work in interim stabilization <br />efforts as well as their attempts in saving specimen trees. <br />creation of parking bays, turn lanes on <br />advised that prior to returning to the <br />estimate available for the lowerin <br />provide cost - savings by including it %ec <br />safety issues with the curve currentl <br />Schwartz also advised that through <br />at the same time, there we <br />less than originally estima <br />veNMe the project; and <br />il, ated having an <br />on nd C -2 that would <br />A. ne and address <br />We designs Nolnu ds. Mr. <br />scale in be the work <br />construction costs may be <br />LM doing the work now. <br />Oof compliance with <br />so Boulevard during <br />and clarified that Ms. McKeown <br />Cities Program, not with Eureka Recycling as <br />Ms. Mc noted Ihat the confusion was from their being housed at Eureka <br />now, since t e previously housed at the Green Institute before they closed, <br />and Eureka of host and support their efforts at their facility. Ms. <br />McKeown advise hat GreenStep Cities was a state -wide cooperative partnership <br />among non - profit agencies, the U of MN, and various government agencies, and <br />was an energy program, not a recycling program. <br />Ms. McKeown presented a slide presentation of this MPCA GreenStep Cities <br />Program, whose effort was toward implementing sustainability by encouraging <br />cities and other government entities to voluntarily bring together proven best <br />practices throughout cities in the State of MN to achieve sustainability goals, <br />through twenty -eight (28) best practices in five (5) different categories. <br />Page 3 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.