Laserfiche WebLink
EXHIBIT A — Page 3 <br />Aomptance Phase Activities <br />Egagk2aW.Je9 I specializes In the review of controls systems. Our staff 'i's Intimately <br />famIli ar with the control systems through years of experience installing, testing, troubleshooting <br />and repairing systems. <br />Control sequences Will be verified along with the hardware and <br />software points required to perform the control sequences. <br />Testing will begin when the controls contractor supplies KFI with <br />documentation, confirming that equipment and systems are fully <br />operational and any graphical interlace "is complete. <br />Upon completion of our 'initial testing, an Issue Tracking List Is <br />promptly developed and issued to the project team to forward to <br />the contractors for appropriate action. <br />KFI Will come to the site to review the Issue Tracking List items with the contractors and later <br />return to verify the rework when notified that correction actions were completed. <br />Defiverables.- System functional test forms <br />Deficiency Issue Tracking Form <br />KFI will utilize our National Environmental Balancing <br />Bureau (NES13) certification expertise to review test and balance <br />procedures and documentarian. Balance reports will be reviewed for <br />accuracy and completeness. Sample measurements will be performed by <br />KFI staff to verify report validity. Certified equipment will be used as <br />necessary to assist with these procedures. <br />Deliverables.- TAB verfficadon farm <br />Closeout Phase A clAoffies <br />Traim i ill assist with contractor training coordination. While training is the <br />contector's responsibility, we will work to ensure that the sessions meet the owneys needs. This <br />Is accomplished by reviewing contractor supplied training agendas assisting in coordinating <br />schedules and staff, and witnessing actual training sessions for content approval. <br />f1ggLO&= A final report will be developed upon commissioning completion, The report "III <br />detall the procedures used and the results achieved. A copy of all project documentation <br />deveI oped or obtained by KFI during the project is also included. <br />Deliverablas.- Final Report <br />