Laserfiche WebLink
14 <br />329 Well- Connected Internally and Externally through Transportation and <br />330 Technology Infrastructure <br />331 <br />332 Existing Work Plan Items: <br />333 <br />334 • Resurrect Northeast Corridor Planning in coordination with Metropolitan Council (IN <br />335 PROGRESS —Very little done in 2011; work through Metro Cities ?) <br />336 • Participate in Planning Rice St Reconstruction Phase 2, County Rd. B -2 Rosedale area <br />337 Project, Lexington Ave. Interchange Replacement (IN PROGRESS — Rice St. and B -2 <br />338 projects being advanced; City doing plans & specs for City portions; Lex Ave Int a 2014 <br />339 project) <br />340 • Improve Walkability of Neighborhoods By Continuous Additions of Trails and <br />341 Sidewalks (ONGOING — Dale St in 2011; Fairview 2011112; Acorn Park ?) <br />342 <br />343 Items from January 30 meeting: <br />344 <br />345 • (moved from Economically healthy ... ) Establish sustainable funding mechanisms for the <br />346 replacement of city information systems, streets, sidewalks, and parking lots <br />347 • Increase connectivity and walkability by developing abuild -out plan for existing pathway <br />348 master plan and parks & rec master plan pathway components, including projected costs <br />349 and timing (year 1, year 2, etc.); add missing short links to connect multi - family to bus <br />350 stops and school crossings (on the same side of the street as the complex) <br />351 • Participate in regional transportation planning efforts -to ensure adequate regional <br />352 resources are allocated to transit and transportation infrastructure to serve Roseville needs <br />353 • Continue to lobby for the Northeast Diagonal transportation corridor <br />354 <br />355 <br />02/13 <br />