Laserfiche WebLink
AGENDA SECTION'. <br />REQUEST FOR COUNCIL ACTION GATE: — " ° „' <br />L2 <br />ORIGINATING DEPT./DIV,: <br />PUBLIC 'HOOKS <br />DEPT. HEAD APPROVAL- <br />cvff - <br />ITEM NO. ITEM DE SCRI Fri ON. CHANGE ORDER NO, 6, CITY HALL, MGR. REViBVED/ RECOMMENDS <br />J PROJECT M-74-29 <br />The paving and parking lot work at the city hall has been stepped' up in <br />intensity and with this Work,, sonie revis'ions have been. found to be <br />necessary to meet conditions., <br />Included in these are two adjustments in the Parking areas which were acm- <br />comphed as fleld orders to avoid stopping the project, <br />Field Order No.3* is adding 2 addit'ional parking spaces on the <br />Is <br />south end of the fire station parking lot to make the drainage In the area <br />coincide with the previously placed storm drain which was placed several <br />weeks earlier as part of the street project.. This earth work',,gradIng anil <br />bituminous paving was done as added cost of $605.626 <br />Field Order No. 4* was for 75 feet of curb and 'gutter along the <br />area the police.will park in near the garage. This curb.and gutter had <br />been left out ariginally because of fears of high bi - ds and is needed to <br />properly control storm water.-runoff which would. have go'ne down the steep <br />embankroent without the curb 6nd gutters. Thi's Item has an added cost of: <br />$280,88* <br />NOTE: * indicates iteim initiated by city staff., <br />The total for approving Field Orders 3- and 4 is $886.50 bringing the granfl <br />total.-for all change ordem to date to $16.,726,42, <br />C <br />