Laserfiche WebLink
AGENRA SECTION: <br />REQUEST FOR C�UNCIL ACTI�N <br />ORIGINATING DEPT./DIV_: <br />REPORTS AiJD R�COMME��DATIOPJS PUBLIC IJORiC <br />I 4 NO.: ITEM OESCRIP710N: <br />P�TITIDN FOR QELLL�IDOD AV�P�UE, S�JUTH OF <br />�"!� JOSEP�IIN� ROAD- Pro.iect 4J-P--75-7 <br />DAT�: 5� 22� ��j <br />DEPT.HEAD APPROVAL. <br />C c/l� <br />MGR. �VIEWED/RECOMMENpS: <br />In 1969, several of the property owners along Dellwond Avenue ���ween Josephine <br />Road and the cit.y �ark, just north of Coun�y Road C-2, circuiated a petitian <br />requ�stin� the instaliatian of necessary utitities and the construction af a <br />roadway on aellwood Avenue to serve their par�eIs. At that time, it was recom- <br />rnended -�hat the project not be pursued, because of tl�e r�ecessity of havinq storm <br />drains constructed to serve this area. The awners submitted a petition once again <br />in 1973, but this peti��on was h�id in abeyance since storm drains were still <br />1 acki ng i n tfie area. Pqr. Jack 4Ji � 1 i s, who ci rcul a�ed tt�e pe�i �i o�, has now sent <br />the attached 7etter to the city once again, requesting consideratian 4f the improve- <br />ment and that thzs latest petit�on of over 35% signers be reconsidered. <br />As you know, a petfiion has also been r�ce�ved in the area of Ham1ine and Josephine <br />for storm drains to serve t�is roadway and if it is approvea, Dellwood Avenu� <br />wauid then b� a viabie project. In as much as the past work has resulted in a d�sign <br />be�ng done and a quanti�,y estimate comp7eted, it wou1d only require the updating i-n -��� <br />review of this past woric to prepare a feasibility study for the Council's consider- <br />ation. iherefare, it is suggested that this petition be receiv�d at this time and <br />a feasibi7ity study ordered with this project to be tim�d in such a way that the <br />decisions would be made after thase of the storm sewer project. <br />Recorrunended action: R�c�ipt of a pet�tion from the owners af Dellwood Avenue <br />from Josephine Road to 6a0 feet south, for the construc- <br />tion of watermains and paving ar�d the authorization of the <br />city staff ta prepare a-�easibility study far this improve- <br />ment, wh�ch is identified as Project IJ-P-75-7. <br />��� <br />.,G:�'�i� ��,.v��l-f� <br />