Laserfiche WebLink
83 conditions for the entire length of County Road C -2 between Hamline and Lexington. <br />84 We developed a corridor design that meets MSA standards for both the short term and <br />85 long term. The new design for the segment of the corridor between 1261 County Road <br />86 C -2 and Griggs Street has a significantly lower cost than the one proposed in the County <br />87 Road C -2 traffic study. The updated "Scenario 2" cost estimate is included in the <br />88 financial discussion below. Including this segment in the 2012 project will mean less <br />89 cost to the City and less disruption to the neighbors in the long run. The future project to <br />90 lower the road profile in this street segment will mean the removal and reconstruction of <br />91 the sidewalk and driveways included in the 2012 project. It will also mean that the <br />92 property owners along County Road C -2 in this segment would only have one <br />93 construction season disruption in the next 10 years. As a result of these items staff is <br />94 recommending that we move ahead with the modifications to this segment this year. <br />95 POLICY OBJECTIVE <br />96 County Road C -2 from Snelling Avenue to Victoria Street is a street on the City's Municipal <br />97 State Aid (MSA) system. City policy is to use MSA funds to fund construction work on MSA <br />98 streets. No assessments are proposed for this project. <br />99 FINANCIAL IMPACTS <br />loo What follows are updated cost estimates for the County Road C -2 construction project. These <br />1 o1 estimates include all roadway construction, driveway removal and replacement, boulevard <br />102 restoration, tree removal, tree installation, and utility work necessary to complete the project <br />103 described above. In the October 17 Council memo, we called the traffic study design "Scenario <br />104 2" and it included the Scenario 1 connection cost and the cost to reconstruct the road between <br />105 Merrill and Griggs. For comparison purposes, both the 2011 Scenario 2 cost and the revised <br />106 Scenario 2 cost in the table below, is only the cost to modify the profile of the road between <br />107 Merrill and Griggs. The cost to construct the connection is the Scenario 1 cost. The revised <br />108 estimates include a 10% contingency. <br />109 <br />11 o The project would be funded using MSA money. Staff has determined that we have adequate <br />111 funds to support the proposed project. <br />112 STAFF RECOMMENDATION <br />113 Staff recommends the approval of the County Road C -2 plans with the following components: <br />114 • Construct Scenario 1- County Road C -2 connection between Griggs St and Dunlap St. <br />115 • Construct Scenario 2- Modify profile between Merrill Street and Griggs Street. <br />Page 3 of 4 <br />2011 estimate <br />Revised <br />Estimate <br />Scenario 1 (construct road connection between <br />Griggs and Dunlap St) <br />$131,000 <br />$12800 <br />Scenario 2 (modify road profile from Merrill St to <br />Griggs) <br />$55200 <br />$22500 <br />Narrow road between Hamline and Merrill St <br />$11400 <br />$7000 <br />Construct 6 ft wide sidewalk (north side of road) <br />$12500 <br />$8500 <br />Streetsca e Cost <br />$50,400 <br />$2000 <br />Construct right turn lane at Hamline Ave <br />NA <br />$800 <br />Construct right turn lane at Lexington Ave <br />NA <br />$800 <br />Total Estimated Project Cost <br />$972,400.00 <br />$54400.00 <br />109 <br />11 o The project would be funded using MSA money. Staff has determined that we have adequate <br />111 funds to support the proposed project. <br />112 STAFF RECOMMENDATION <br />113 Staff recommends the approval of the County Road C -2 plans with the following components: <br />114 • Construct Scenario 1- County Road C -2 connection between Griggs St and Dunlap St. <br />115 • Construct Scenario 2- Modify profile between Merrill Street and Griggs Street. <br />Page 3 of 4 <br />