My WebLink
|
Help
|
About
|
Sign Out
Home
2012_0312_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2012
>
2012_0312_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2012 3:27:33 PM
Creation date
3/8/2012 4:03:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
View images
View plain text
Attachment E <br />FIRM BACKGROUND AND QUALIFICATIONS <br />The City of Roseville will review and evaluate each proposal, and selection will be made on the basis of <br />the criteria listed below. The firmssubmitting proposals shall include with their proposal statements on <br />the following: <br />A.Proven management skills and technical competence including specialized experience in <br />comprehensive surface water management plan (CSWMP) development. Demonstrated <br />performance in providing well organized, accurate, and fully coordinated documents; and projects <br />delivered on time and within budget. (5 pages maximum) <br />Management Skills and Technical Expertise include as a minimum: <br />List of CSWMPs completed including description, scope, project cost, and owner’s contact <br />information. Provide access to an example report completed by the firm via the internet. <br />Information on delivery of projects on time and within budget. Provide design time <br />(contract/actual); cost ofplan (estimated/actual); problems encountered and solutions devised. <br />Minimum 2, maximum 4similar projects. <br />B.Credentials of project team, including: project manager’s related projects; history of the proposed <br />team working together on past projects, particularly as related to prior work within confinedsite plan <br />CSWMP projects.(1 page each) <br />Include as a minimum: <br />1.Identification of project manager and project team. <br />2.Project manager’s resume and portfolio of related projects. <br />3.Resumes of key project staff members. <br />Page 16 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).