My WebLink
|
Help
|
About
|
Sign Out
Home
2012_0319_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2012
>
2012_0319_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2012 3:25:52 PM
Creation date
3/15/2012 3:42:12 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR COUNCIL ACTION <br /> Date: 3/19/12 <br />Item No.: 13.b <br />Department Approval City Manager Approval <br />Item Description: Discuss Undergrounding of the Overhead Electric Lines along Rice Street <br />for next phase of reconstruction <br />B <br />ACKGROUND <br />1 <br />Ramsey County is developing plans for reconstruction of Rice St. from Transit Ave. to County <br />2 <br />Road C-2. The actual construction is expected to begin in the spring of 2013. The cities of <br />3 <br />Roseville and Little Canada cooperated on the Highway 36 interchange project to have Xcel bury <br />4 <br />the overhead power lines that currently run along the west side of Rice Street. These overhead <br />5 <br />electric lines and poles continue north from the previous project and blight the corridor. Little <br />6 <br />Canada has stated an interest in continuing this effort on this corridor for this next phase of <br />7 <br />reconstruction. <br />8 <br />9 <br /> Xcel Energy has provided a preliminary estimate of $1,322,343 to bury the power lines from <br />10 <br />County Road B-2 to County Road C2. Xcel is continuing preliminary design and refinement of <br />11 <br />the scoping estimate. In the previous project the costs were split equally between the two cities <br />12 <br />despite the majority of the overhead lines are located on the Roseville side of Rice St. There are <br />13 <br />also some additional costs for easements necessary for ground mounted transfer switches and <br />14 <br />other equipment. There are also costs for undergrounding of several private overhead electric <br />15 <br />services that are not included in the estimate above. There will have to be a determination of <br />16 <br />whether the service costs are a public cost or are a private property cost. <br />17 <br />18 <br />The Council authorized staff to work with Xcel Energy on a surcharge option for the Xcel to <br />19 <br />recover their incremental costs incurred in Roseville on the previous project. The surcharge <br />20 <br />option, CRFS (Community Requested Facility Surcharge) is available for these projects where <br />21 <br />each rate payer of the city will have a small surcharge added to their electric bill based on a <br />22 <br />citywide formula to finance the cost of the work over a period of time. Staff would recommend <br />23 <br />the Council consider the CRFS option on this next phase of reconstruction as well. <br />24 <br />25 <br />Roseville and Little Canada staff agree that burying the power lines along Rice Street will <br />26 <br />dramatically improve the appearance along this important stretch of roadway that serves as a <br />27 <br />gateway to both cities. Both cities have received comments from the public on the improvement <br />28 <br />to the corridor from the first project without the overhead electric lines. Burying the power lines <br />29 <br />will mean the overhead communication lines will need to be relocated underground as well since <br />30 <br />they are on Xcel’s power poles by agreement. <br />31 <br />32 <br />FI <br />INANCIAL MPACTS <br />33 <br />We have not received the per customer cost at this time from Xcel. The Roseville rate payers <br />34 <br />cost share for the undergrounding of the overhead electric lines is proposed to be financed by a <br />35 <br />Page 1 of 2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.