Laserfiche WebLink
<br />ANYONE OUTSIDE OF THE TWIN LAKES PROJECT TO <br />ASSIST WITH THE TRANSPORTATION WITHIN OR <br />CONNECTED TO THIS PROJECT. WE HAVE NO <br />ASSURANCE THESE FUNDS WILL BE REALIZED. <br />4. MR. CASSERLY HOPES FOR UP TO $3 MILLION IN <br />ENVIRONMENTAL GRANTS. THESE IS MERELY PICKING <br />A FIGURE OUT OF THE AIR. THERE IS NO ASSURANCE <br />THESE FUNDS WILL BE REALIZED. <br /> <br />B. EXPENSES CUT: <br /> <br />1. RELOCATION EXPENSES OF 1.4 MILLION WERE <br />ELIMINATED. THERE IS NO STATED JUSTIFICATION FOR <br />DOING SO. <br />2. SITE PREPARATION COSTS OF $3 MILLION WERE <br />ELIMATED. THERE IS NO STATED JUSTIFICATION FOR <br />DOING SO. <br />3. STREET COSTS WERE REDUCED BY $1.4 MILLION. <br />THERE IS NO STATED REASON FOR DOING SO. <br />4. CONTINGENCIES WERE REDUCED FROM 6.7 MILLION <br />DOWN TO 2 MILLION BY ELIMINATING ANY <br />CONTINGENCY CONNECTED WITH THE ACQUISITION OF <br />THE LAND. THERE IS NO REASON FOR DOING SO. LAND <br />ACQUISITION IS THE MOST MONEY ($47 MILLION), AND <br />THE AMOUNT TO BE PAID FOR THE LAND IS NOT <br /> <br />4 <br />