Laserfiche WebLink
<br />City of Roseville <br /> <br />Proposed Schedule of Fees and Charges for Service <br />Effective January 1, 2005 <br /> <br />(minimum charge - one-half hour) <br />Additional plan review required by changes, additions <br />or revisions to plans. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$48.41 per hour <br />(minimum charge - one-half hour) <br />F or use of outside consultants for plan checking, inspections <br /> <br /> <br />and similar costs..... ........ ... .......... ......... .... ......... ....... ...... ........ .... ........ ...... .....Actllal costs I <br /> <br />Actual costs include administrative and overhead costs. <br /> <br />Demolition Permit Fee: <br />Tenant improvement/remodeling prior to building pemlit <br />Structures not connected to utilities <br />Structures connected to city utilities <br /> <br />$51.50 <br />$51.50 <br />$103.00 <br /> <br />Electrical Permit Fee: <br />Set through yearly contract with Contract Electrical Inspector <br /> <br />Fire Safety Inspection Fee: <br />An amount equal to eight percent (8010) of the amount determined by the Building Permit Fee <br />(except for single-family dwellings) to be charged and used to defray the cost of fire safety <br />inspections (Ord. 1237,3-13-2000, eff. 5-1-2000) <br /> <br />GradinglExcavation Permit Fee: <br /> <br />Grading Plan Review Fee <br /> <br />50 cubic yards or less........................................................................ ..No fee <br />51 to 100 cubic yards or less............................................................... ...$24.20 <br />101 to 1,000 cubic yards..................................................................... .$38.11 <br />1,001 to 10,000 cubic yards.. .. . .. .. .... .. ..... .. .. .. . .. .... . .. .. .. .. .. . .. .. .. . .. .. .. .. . .... ..$50.72 <br />10,001 to 100,000 cubic yards - $50.72 for the first 10,000 cubic yards, plus $25.24 for <br />each additional 10,000 yards or fraction thereof. <br />100,001 to 200,000 cubic yards - $277.84 for the first 100,000 cubic plus $13.65 for each <br />additional 10,000 cubic yards or fraction thereof. <br />200,001 cubic yards or more - $414.32 for the first 200,000 cubic yards, plus $7.47 for <br />each additional 1 0,000 cubic yards or fraction thereof. <br />Other Fees: <br />Additional plan review required by changes, additions or revisions to approved plans <br />(minimum charge - one-half hour). .................................. ................$52.00 per hour <br /> <br />5 <br />