Laserfiche WebLink
8 <br /> 194 Well-Connected Internally and Externally through Transportation and <br /> 195 Technology Infrastructure <br /> 196 <br /> 197 Existing Work Plan Items: <br /> 198 <br /> 199 • Improve Walkability of Neighborhoods By Continuous Additions of Trails and <br /> 200 Sidewalks (ONGOING—Dale St in 2011; Fairview 2011112;Acorn Park?)(Long Term) <br /> 201 <br /> 202 Short Term: <br /> 203 <br /> 204 • Continue to lobby for the Northeast Diagonal transportation corridor. <br /> 205 • Establish sustainable funding mechanisms for the replacement of city information <br /> 206 systems, streets, sidewalks, and parking lots. (CIP Task Force) <br /> 207 • Develop abuild-out plan for existing pathway master plan and parks & rec master plan <br /> 208 pathway components, connect multi-family to bus stops and school crossings (on the <br /> 209 same side of the street as the complex). (Short term/Long term for Departments and CIP.) <br /> 210 Long Term: <br /> 211 • Participate in regional transportation planning efforts-to ensure adequate regional <br /> 212 resources are allocated to transit and transportation infrastructure to serve Roseville needs <br /> 213 <br /> 214 <br />