Laserfiche WebLink
<br />Regular City Council Minutes - 9/22/03 <br />Page 2 <br /> <br />III. <br /> <br />Presentations <br /> <br />A. <br /> <br />Presentation of Final Bid Groups and Selection of <br />Some Alternate Bids for Building Project <br />Kysylyczyn moved, Klausing seconded approval of the <br />following bid groups: <br /> <br />Bid Group Bidder/Company Description Bid <br /> Amount <br />9 Anchor Fence Ornamental Metal Fence $26,625 <br />10 Valleycrest Landscaping 168,750 <br />13 Metro Mfg., Inc. Misc. Metals 149,960 <br />14 Heebink Architectural Millwork 93,130 <br /> Woodwork <br />15 Kellington Carpentry 104,600 <br /> Construction <br />17 Right - Way Caulking Caulking 44,800 <br />18 M. G. McGrath Aluminum Panels 194,828 <br />19 Daleo Roofing & Roofing 358,321 <br /> Sheet Metal <br />21 Kendell Doors & Detention 18,250 <br /> Hardware Doors/Hardware <br />22 Kellington Door/Hardware 37,800 <br /> Construction Installation <br />23 Twin City Garage Overhead Doors 54,647 <br /> Door <br />25 Harmon, Inc. Windows and Glazing 232,800 <br />26 Twin City Tile Ceramic Tile 68,000 <br />27 Twin City Acoustics Acoustic Ceilings 205,600 <br />28 Spectra Contract Carpet & Resilient 115,384 <br /> Flooring Flooring <br />29 Steinbrecher Painting, Painting 71,735 <br /> Inc. <br />31 Bartley Sales Toilet Partitions 4,525 <br />32 Construction Supply Flagpoles 4,766 <br />33 Mid-America Business Lockers 38,148 <br /> Systems <br />34 Nardini Fire Equip. Fire Extinguishers & 2,074 <br /> Co. Cabinets <br />35 Kellington Misc. Installation 16,140 <br /> Construction <br />37 W. L. Hall Co. Operable Panel 15,480 <br /> Partitions <br />38 Bartley Sales Toilet Accessories 7,390 <br />39 Construction Supply Proj ection Screen 1,969 <br />40 WDSI Detention Equipment 50,000 <br />41 Bartley Sales Floor Mats 4,340 <br />43 Schindler Elevator Elevator Equipment 60,200 <br /> <br />Public Works Director/Project Manager Duane Schwartz <br />reported on the status of the construction project and the <br />bids received on finish construction work. Mr. Schwartz <br /> <br />Presentations <br /> <br />Presentation of <br />Final Bid Groups <br />and Selection of <br />Some Alternate <br />Bids for Building <br />Proj ect <br />