My WebLink
|
Help
|
About
|
Sign Out
Home
2012-04-24_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2012
>
2012-04-24_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2012 4:16:22 PM
Creation date
4/19/2012 4:08:09 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
4/24/2012
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
jurisdictions within the City of Roseville. The projects shall be prioritized based on <br />the following criteria: <br />1St Criteria: Any previously funded underground utility priority corridor project <br />which was subsequently removed from funded list and placed on <br />deferment. <br />2nd Criteria: All identified corridor reconstruction projects where utility pole <br />relocation is necessary for the public facilities construction. <br />3`d Criteria: All identified undergrounding corridor projects contiguous to <br />previous undergrounding. <br />4d' Criteria: Any corridor adjacent to public facilities, schools, retail areas, and <br />parks, and recreation facilities. <br />5d' Criteria: Corridors with over 5000 ADT traffic volumes. These corridors <br />provide access for emergency first responders and would benefit <br />from minimum risk of obstruction from damaged overhead <br />facilities. <br />6d'Criteria: Corridors with existing or planned major pedestrian facilities. <br />7d' Criteria: Tree preservation <br />8d' Criteria: Entry corridors to the city where aesthetics create a positive image <br />for visitors and residents. <br />a. Funding of projects: <br />Undergrounding of overhead electric utility lines will be funded utilizing the PUC <br />authorized Community Requested Facilities Surcharge which has an established <br />maximum stacking amount on a customer's electric bill. CRFS Projects will be <br />limited by the amount available for additional surcharge. <br />This policy does not prohibit neighborhood initiated request of undergrounding if <br />alternative sources or methods of funding are identified. <br />
The URL can be used to link to this page
Your browser does not support the video tag.