Laserfiche WebLink
Preferred site of Community Center identified as City Hall/Skating <br />Center Campus <br /> LB 10/11 <br />Community Center identified in Adopted Park Master Plan, <br />November 2010 <br /> LB 1/11 <br />Discussions during Master Plan Implementation Phase, November <br />2010 <br /> LB 1/11 <br />Will be incorporated into the anticipated Master Plan process to <br />determine need and locations. <br />LB 7/08 <br />Establish a Community Resource and <br />Proposal accepted by the 2009 Leadership St. Paul Program to assign <br />Volunteer Center/Network with support <br />a group to Roseville to enhance the volunteer program by creating a <br />and coordinating staff to recruit, train, <br />comprehensive community volunteer model. <br />LB 3/09 <br />nurture volunteers. <br />Researching possible resources needed to establish such a program <br />and what a program of this type would look like. <br />LB 7/08 <br />Identify segments with poor or no <br />Completed Construction of Fairview NTP Pathway south of Co Rd B <br />connection. Follow Master plan guide. <br />in 2011 <br />DS 1/12 <br />Address Hwy 36 and Snelling crossing <br />Completed Dale Street Sidewalk <br /> DS 1/12 <br />barriers: tunnels or bridges at Lydia, <br />Constructed Snelling Service Drive sidewalk from Aeon project to <br />Co C, Co B, or Roselawn <br />County Road B <br /> DS 10/11 <br />Constructing Sidewalk and Shoulders on Fairview South of County <br />Road B <br /> DS 7/11 <br />No new activity. <br /> DS 6/09 <br />Developing Fairview NTP Pathway project for 2009 construction. <br />Seeking funding opportunities <br />. DS 3/09 <br />Pathway Master Plan adopted September 08. Seeking funding <br />opportunities <br />. DS 10/08 <br />Discussed as part of Pathway Plan update, incorporate into final draft <br />plus additional locations. <br />DS 7/08 <br />Consider Roundabouts, if space and <br />Second Roundabout to be constructed in Twin Lakes Summer 2010 <br />DS <br />buying R.O.W. is feasible <br />5/10 <br />First Roundabout will be constructed late summer 2009 in Twin <br />Lakes Phase I <br /> DS 6/09 <br />Roundabout included in Phase I Twin Lakes improvements <br />construction 2009. <br /> DS 3/09 <br />No new activity <br />. DS 10/08 <br />Look into ROW requirements and identify possible corridors 2009. <br />DS <br />08 <br />7/ <br />Add buses and routes for flexibility and Metro Transit evaluation Bus Rapid Transit for Snelling Ave. and <br />suburb-to-suburb travel <br />other service to area including a new Park N Ride facility in Little <br />Canada <br />DS 4/11 <br />Have had additional discussion with Metro Transit regarding <br />additional service to Park N Ride <br /> DS 4/10 <br />No new activity <br />DS 6/09 <br />Explore opportunities created by new Park N Ride <br /> DS 3/09 <br />Discussed this flexibility with Metro Transit for Twin Lakes Park N <br />Ride facility <br />. DS 10/08 <br />Continue to push this issue in all discussions with Metro Transit. <br />DS <br />7/08 <br />Encourage development of transit, <br />Participating in Bus Rapid Transit Study for Arterial Corridors <br />walkability and alternate transportation <br />including Snelling Avenue <br /> DS 7/11, DS 1/12 <br />Provided feedback to Metro Transit on proposal for additional Park N <br />Ride facility in Little Canada at County Road B and Rice St <br />DS 5/10 <br />Draft of new residential and commercial zoning codes promotes <br />design that promotes walkability. <br />PT 6/10 <br /> <br />