My WebLink
|
Help
|
About
|
Sign Out
Home
CC_Minutes_2002_0429
Roseville
>
City Council
>
City Council Meeting Minutes
>
200x
>
2002
>
CC_Minutes_2002_0429
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 9:39:35 AM
Creation date
8/9/2006 12:40:59 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Minutes
Meeting Date
4/29/2002
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Metro Division <br />1500 County Road 82 West <br />Roseville MN 55113 <br /> <br />Phone: <br /> <br /> <br />000 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />(RoseviHe, IVIinn.) - at 8 p.m. Monday evening, Apri129, <br />on Interstate 35W between Highway 36 in Roseville and Lake Drive (Anoka County Road 23) in <br />Blaine. Motorists should expect major congestion and delays during the project. Crews will <br />work around the clock, seven days a week until the resurfacing of all driving lanes and ramps is <br />completed. The emergency work is necessary to correct problems with a crack sealant that failed <br />last Thursday afternoon, April 18, in the northbound lanes ofl-35W between County Road 88 <br />and H\vy. 96 in Arden Hills. <br />The sealant failed when it became soft in the afternoon heat and humidity causing it to <br />stick to the tires of passing vehicles. The material was placed in the roadway late last fall during <br />a routine crack-sealing maintenance operation. Hot temperatures and rain during the past \veek <br />apparently triggered the failure, according to MnlDOT Metro Division Maintenance officials. <br />Resurfacing will begin on the northbound lanes with milling of the roadway surface. While <br />crews are working on the south end of the project area between Hwy. 36 and and 1-694, traffic will <br />be restricted to a single lane from 5 a.m. until 8 p.m. daily including weekends (except during rush <br />hour from 3 p.m. to 6 p.m. Monday through Friday). The interstate will then be closed each night <br />from 8 p.m. until 5 a.m. the following moming between Hwy. 36 and 1-694. Traffic \vill detour on <br />Snelling Avenue (Highway 51) and 1-694. <br />As work moves north ofl-694 to Lake Drive, traffic will be restricted to a single lane in each <br />direction 24 hours a day; seven days a week except during the afternoon rush hour between 3 p.m.. <br />6 p.m.; Monday through Friday. <br /> <br />-MORE- <br />
The URL can be used to link to this page
Your browser does not support the video tag.