NOTICE TO BIDDERS may be notified via email as
<br /> ROSEVILLE FIRE addenda are issued but are
<br /> STATION PROJECT responsible to check the website for
<br /> all addenda prior to submitting a bid.
<br /> BID PACKAGE#2 Parties that download the bidding
<br /> Notice is hereby given that sealed documents and need to have them
<br /> bids will be received at the office of printed elsewhere are solely
<br /> The City of Roseville, 2660 Civic responsible for those printing costs.
<br /> Center Drive, Roseville, Minnesota Parties downloading bidding
<br /> 55113, Attention: City Manager, on documents from other sources(such
<br /> Tuesday, May 15, 2012, until 2:00 as builder exchanges) may contact
<br /> P.M., at which time they will be Bossardt Corporation to be added to
<br /> publicly opened and read aloud to the Plan Holders List but will need to
<br /> provide complete bids for the obtain addenda from their original
<br /> following Contracts: source unless the party specifically
<br /> 0330 Cast-in-Place Concrete/Slabs, request access to the Project Plan
<br /> 0340-Structural Precast Concrete, Room Website.
<br /> 0420 - Masonry/Architectural Documents can be viewed at the
<br /> Precast,0510-Structure Steel/Steel City's office,at CNH Architect's office
<br /> Joists/Metal Deck—Erection,0512- — 7300 West 147th Street, Suite
<br /> Structure Steel/Steel/Joists/Metal #504, Apple Valley, Minnesota
<br /> Deck — Supply, 0610 - Rough 55411, at Bossardt Corporation,
<br /> Carpentry/Accessories, 0750 - 5270 West 84th Street,Suite,#550,
<br /> Roofing/Sheet Metal/Wall Panels, Minneapolis, Minnesota 55437, at
<br /> 0810 - Metal Doors/Frames/Wood the offices of Minneapolis, St. Paul,
<br /> Doors/Hardware — Supply, 0833 - Mankato,Rochester,St.Cloud,and
<br /> Coiling Doors/Sectional Doors, Mid-Minnesota Builder's Exchanges:
<br /> 0840- Aluminum Entrances/ Reed Construction Data (CMD),
<br /> Windows/Glazing, 0920 - MEDA Minority Contractors,
<br /> Drywall/Stucco, 0930—Tile, 0950- McGraw-Hill Construction Plan
<br /> Acoustical Ceilings,0965-Resilient Room and Associated General
<br /> Flooring/Carpet, 0990 — Painting, Contractors of Minnesota.
<br /> 1230 - Manufactured Casework, Please contact Quinn Hutson at
<br /> 1420 — Elevator, 2100 — Fire CNH Architects at 952-997-4583 for
<br /> Protection,2200-Pluming and Heat clarification regarding the Bidding
<br /> Piping,2300-HVAC/Air Distribution, Documents or Tom Ginter,Bossardt
<br /> 2305 - Testing and Balancing for Corporation at 952-837-3340 for
<br /> HVAC,2500-Temperature Controls, Bidding Procedures.
<br /> 2600 - Electrical/Communication The City of Roseville reserves the
<br /> /Security/Technology, & 3200 - right to reject any or all bids received
<br /> Landscaping and to waive informalities and
<br /> Faxed or emailed bids will not be irregularities in the bids received.No
<br /> accepted. Mark the outside of the bid may be withdrawn for a period of
<br /> envelope 90 days after the opening of the bids.
<br /> Bid Package #2 —Roseville Fire THE CITY OF ROSEVILLE
<br /> Station,include the Contract Number (Roseville Review:May 1,8,2012)
<br /> and Description.
<br /> Each bid must be accompanied by
<br /> a bid security in the form of a
<br /> certified check, cashier's check, or
<br /> bid bond in the amount of five (5)
<br /> percent of the bid amount submitted.
<br /> Bid security shall be payable to the
<br /> City of Roseville without conditions.
<br /> A pre-bid meeting will be held on
<br /> Thursday,May 3,2012,at 2:00 P.M.,
<br /> at the Roseville City Hall at 2660
<br /> Civic Center Drive, Roseville,
<br /> Minnesota 55113.
<br /> Bidding Documents will be available
<br /> on or after Tuesday,April 24,2012.
<br /> Documents may be obtained by
<br /> contacting the Construction
<br /> Manager, Bossardt Corporation,
<br /> Attention:Victoria Vandelinde at
<br /> 800-290-0119 or 952-837-3341.
<br /> Hardcopy bidding documents will be
<br /> available for a refundable deposit of
<br /> $150. Electronic bidding documents
<br /> including addenda can be
<br /> downloaded at no cost from the
<br /> Project Plan Room Website setup by
<br /> CNH Architects. Contact Victoria
<br /> Vandelinde at Bossardt Corporation
<br /> at the numbers above to receive
<br /> access to the website.Plan Holders
<br />
|