Laserfiche WebLink
BMP Summary Sheet <br />MS4 Name: City of Roseville <br />Minimum Control Measure: 3- ILLICIT DISCHARGE DETECTION AND <br />ELIMINATION <br />Unique BMP Identification Number: 3a -1 <br />*BMP Title: Storm Sewer System Map <br />*BMP Description: <br />The City maintains electronic maps of the storm sewer system and is in the process of completing its digital <br />documentation and verification. Any changes /improvements to the system are included in periodic updates. The <br />storm sewer map will show: <br />1) Ponds, streams lakes & wetlands that are part of the MS4 <br />2) Structural pollution devices that are part of the MS4 <br />3) All pipes & conveyances in the MS4 system, as goal — but at minimum — those pipes >— 24 inches in <br />diameter <br />4) Outfalls, including discharges from Roseville to other MS4s or waters and wetlands that are not part of <br />Roseville (and do not have operational control); structures that discharge storm water directly into groundwater; <br />overland discharge points and all other points of discharge from the MS4's system, not diffuse flows <br />Location(s) in SWPPP of detailed information relating to this BMP: <br />*Measurable Goals: <br />2004 — Complete mapping and verification of 25% <br />2005 - Complete mapping and verification of 50% <br />2006 - Complete mapping and verification of 75% <br />2007 - Complete mapping and verification of 100% <br />*Timeline/Implementation Schedule: <br />Update mapping as infrastructure is constructed. <br />Specific Components and Notes: <br />*Responsible Party for this BMP: <br />Name: Jolinda Stapleton <br />Department: Public Works <br />Phone: 651- 792 -7044 <br />E -mail: jolinda.stapleton @ ci.roseville.mn.us <br />*Indicates a REQUIRED field. Failure to complete any required field will result in rejection of the application due <br />to incompleteness. <br />wq- strm4 -50 <br />