My WebLink
|
Help
|
About
|
Sign Out
Home
2012-05-22_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2012
>
2012-05-22_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2012 3:19:33 PM
Creation date
5/17/2012 3:08:30 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
5/22/2012
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BMP Summary Sheet <br />MS4 Name: City of Roseville <br />Minimum Control Measure: 3- ILLICIT DISCHARGE DETECTION AND <br />ELIMINATION <br />Unique BMP Identification Number: 3a -1 <br />*BMP Title: Storm Sewer System Map <br />*BMP Description: <br />The City maintains electronic maps of the storm sewer system and is in the process of completing its digital <br />documentation and verification. Any changes /improvements to the system are included in periodic updates. The <br />storm sewer map will show: <br />1) Ponds, streams lakes & wetlands that are part of the MS4 <br />2) Structural pollution devices that are part of the MS4 <br />3) All pipes & conveyances in the MS4 system, as goal — but at minimum — those pipes >— 24 inches in <br />diameter <br />4) Outfalls, including discharges from Roseville to other MS4s or waters and wetlands that are not part of <br />Roseville (and do not have operational control); structures that discharge storm water directly into groundwater; <br />overland discharge points and all other points of discharge from the MS4's system, not diffuse flows <br />Location(s) in SWPPP of detailed information relating to this BMP: <br />*Measurable Goals: <br />2004 — Complete mapping and verification of 25% <br />2005 - Complete mapping and verification of 50% <br />2006 - Complete mapping and verification of 75% <br />2007 - Complete mapping and verification of 100% <br />*Timeline/Implementation Schedule: <br />Update mapping as infrastructure is constructed. <br />Specific Components and Notes: <br />*Responsible Party for this BMP: <br />Name: Jolinda Stapleton <br />Department: Public Works <br />Phone: 651- 792 -7044 <br />E -mail: jolinda.stapleton @ ci.roseville.mn.us <br />*Indicates a REQUIRED field. Failure to complete any required field will result in rejection of the application due <br />to incompleteness. <br />wq- strm4 -50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.