My WebLink
|
Help
|
About
|
Sign Out
Home
2012-05-22_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2012
>
2012-05-22_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2012 3:19:33 PM
Creation date
5/17/2012 3:08:30 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
5/22/2012
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BMP Summary Sheet <br />MS4 Name: City of Roseville <br />Minimum Control Measure: 4- CONSTRUCTION SITE STORMWATER RUNOFF <br />CONTROL <br />Unique BMP Identification Number: 4a -1 <br />*BMP Title: Ordinance or other Regulatory Mechanism <br />*BMP Description: <br />The City presently has an ordinance that outlines permit requirements for land alteration, grading and filling. In <br />addition, it has a Minimum Disturbance requirement standard for all developments in its ordinances. Procedures <br />for enforcement included in the ordinance are the following components: <br />1- Requirements for Construction Site Plan submittal by site operators to the MS4, which includes erosion and <br />sediment control and storm water treatment BMPs <br />2 -Site plan review and approval by MS4 prior to activity on site <br />3- Requirements and design standards for temporary erosion and sediment controls during construction activities <br />4- Requirements for record keeping of rainfall amounts and inspections by site operators <br />5- Regular inspections by site operators <br />6- Requirements and criteria for the site operator to conduct dewatering and/or basin draining at the site <br />7- Requirements and criteria for BMP maintenance <br />8- Requirements concernnig waste controls for solid and hazardous wastes <br />9- Requirements and design standards for permanent storm water management controls following the completion of <br />construction activities <br />10- Requirements for stable slopes and the establishment of perennial vegetative cover on all exposed soils upon the <br />completion of any construction activity <br />Location(s) in SWPPP of detailed information relating to this BMP: <br />*Measurable Goals: <br />Implement ordinance <br />Review ordinance annually <br />*Timeline/Implementation Schedule: <br />Implement ordinance <br />Review ordinance annually <br />Specific Components and Notes: <br />*Responsible Party for this BMP: <br />Name: Debra Bloom <br />Department: Public Works <br />wq- strm4 -50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.