My WebLink
|
Help
|
About
|
Sign Out
Home
2012-05-22_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2012
>
2012-05-22_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2012 3:19:33 PM
Creation date
5/17/2012 3:08:30 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
5/22/2012
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BMP Summary Sheet <br />MS4 Name: City of Roseville <br />Minimum Control Measure: 4- CONSTRUCTION SITE STORMWATER RUNOFF <br />CONTROL <br />Unique BMP Identification Number: 4b -1 <br />*BMP Title: Construction Site Implementation of Erosion and Sediment Control BMPs <br />*BMP Description: <br />The City has a review and permit process in place for all proposed land disturbances meeting specified criteria <br />within the City. Applicants are required to use temporary and permanent erosion and sediment control measures <br />and use best management practices on the site to preserve shoreland and vegetation as defined in the erosion and <br />sediment control ordinance. The City has developed an information sheet with a list and description of minimum <br />erosion and sediment control measures /best management practices. This information sheet will be made available <br />to developers /contractors /construction site personnel. <br />Location(s) in SWPPP of detailed information relating to this BMP: <br />*Measurable Goals: <br />Number of plans reviewed <br />*Timeline/Implementation Schedule: <br />Currently in place and will continue annually <br />Specific Components and Notes: <br />*Responsible Party for this BMP: <br />Name: Debra Bloom <br />Department: Public Works <br />Phone: 651- 792 -7042 <br />E -mail: deb.bloom @ci.roseville.mn.us <br />*Indicates a REQUIRED field. Failure to complete any required field will result in rejection of the application due <br />to incompleteness. <br />wq- strm4 -50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.