My WebLink
|
Help
|
About
|
Sign Out
Home
1997 Park and Rec Infrastructure Committee
Roseville
>
Studies, Task Forces, Special Committees, Reports
>
1997 Infrastructure Advisory Committee
>
1997 Park and Rec Infrastructure Committee
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2014 1:11:58 PM
Creation date
5/25/2012 9:42:13 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF ROSEVILLE <br />INFRASTRUCTURE COMMITTEE <br />ASSIGNMENT: <br />To study and advise the City Council on the issues of recreational infras#ructure elements <br />believed beneficial to the community utilizing a process which: <br />1. Builds on the VISTA 200Q community planning process, <br />2. Evaluates, amends, and prioritizes the work of fhe Parks and Recreation <br />Commission, <br />3. Considers the varied recreational infrastructure needs of the community in relation <br />to the financial resources and possible partnership opport�nities to minimize direct <br />City investment. <br />SCOPE: <br />To address infrastructure needs on a Citywide basis, with special attention paid to <br />strengthening neighborhoods. <br />TIME L.INE: <br />Project completion within six (6) months, with some elements to be completed ear�ier, as <br />needed. <br />PURP�SE: <br />The Council is interested in involving a broad cross section of the community in advancing <br />the work of the City staff, the VISTA 2000 Leisure Committee, and the City Council to chart <br />a course for the community to address its long-term recreational infrastrucfiure needs. The <br />stated major purposes of the lnfrastructure Committee are as follows: <br />A. Review proposed projects that need to addressed immediately. <br />B. Ascertain each project's compliance with the adopted infrastrucfiure policy and <br />inclusion in the Roseville Parks and Recreation Systems Plar�. <br />C. Recommend staff or consultant planning issues. <br />D. Recommend items for possible future referendum. <br />E. Make final recommendation to the City Council on a project by project basis. <br />
The URL can be used to link to this page
Your browser does not support the video tag.