Laserfiche WebLink
<br />City of RoseviUe 2007 Fee Schedule <br /> <br />Mechanical Permit Fee - Residential: <br /> <br />Desc~iption, ' _' , ' '€urrent Amount ,l!roP!JsedAmount' <br />Air conditioning - new $ 38.50 $ 40.00 <br />Air conditioning - replacement 38.50 50.00 <br />Warm air furnace - new 82.50 85.00 <br />Warm air furnace - replacement 44.00 50.00 <br />Hot water boilers - new 82.50 85.00 <br />Hot water boilers - replacement 44.00 50.00 <br />Unit heaters 44.00 50.00 <br />Swimming pool heaters 44.00 50.00 <br />Misc. work & gas piping 1.25% of job cost 1.25% of job cost <br />Minimum fee 38.50 50.00 <br />Gas fireplace $ 44.00 $ 50.00 <br /> <br />Mechanical Permit Fee - COlmnercial: <br /> <br /> <br />I' <br /> <br />All commercial work <br /> <br />III " . III I <br /> <br />Moving Permit Fee: <br /> <br />Description , €urrent Amount Proposed Amount <br />Over private property only $ 75.00 $77.00 <br />Over public streets 110.00 113.00 <br />Investigation fee per hour $55.38 $57.00 <br /> <br />Plumbing Permit Fee: <br /> <br />Description €urrent Amount Proposed Amount <br />Administrative/minimum fee $ 38.50 $ 50.00 <br />Additional for each fixture opening 8.75 9.00 <br />Miscellaneous work 1.25% of job cost 1.25% of job cost <br />Backflow prevention verification $ 22.00 $ 23.00 <br /> <br />Plan Review Fee: <br />When a building permit is required and a plan is required to be submitted, a plan checking fee <br />shall be paid. Plan checking fees for all buildings, except for construction costs in R-I and R-2 <br />zones which do not involve new single family structures and are of less than fifteen thousand <br />dollars ($18,000.00), shall be sixty five percent (65%) of the building permit fee as set forth in <br />Section 901.06 of this chapter, except as modified in M.S.B.C. Section 1300. (Ord. 111 0, 4-13- <br />1992) <br /> <br />8 <br />