My WebLink
|
Help
|
About
|
Sign Out
Home
res_10474
Roseville
>
City Council
>
City Council Resolutions
>
10xxx
>
10400
>
res_10474
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 9:44:19 AM
Creation date
2/26/2007 12:50:00 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Resolutions
Meeting Date
1/29/2007
Resolution #
10474
Resolution Title
RESOLUTION ESTABLISHING THE REVISED 2007 FEE SCHEDULE
Resolution Date Passed
1/29/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />City of Roseville 2007 Fee Schedule <br /> <br />Demolition Permit Fee: <br /> <br />~ " ~ .,,< .~-d ~~ :"; ~:i4;;;')::\0-~"" Curnint ~Jj}ount Propos\l!l ~oUlit <br /> D\l~cpnijon Tenant improvement/remodeling prior to building permit $55.00 $56.00 <br />Structures not connected to utilities 55.00 56.00 <br />Residential structures connected to city utilities 110.00 114.00 <br />Commercial structures connected to city utilities $250.00 $257.00 <br /> <br />Electrical Permit Fee: <br />Set through yearly contract with Contract Electrical Inspector <br /> <br />Fire Safety Inspection Fee: <br />An amount equal to eight percent (8%) of the amount detetmined by the Building Permit Fee <br />(except for single-family dwellings) to be charged and used to defray the cost of fire safety <br />inspections (Ord. 1237,3-13-2000, eff. 5-1-2000) <br /> <br />Grading Plan Review Fee: <br /> <br />- - - -Description:----:-::- - . -.-. .--Ctiiiint'1~nrOiiiit - --;- -- -:-:;:' ::.Proposeo AmOiint~---::. - <br /> ~ ~ , ' <br />50 cubic yards or less $0 $0 <br /> $52.75 for the first 10,000 cubic $54.00 for the first 10,000 <br />51 - 100,000 cubic yards yards, plus $26.25 for each cubic yards, plus $27.00 for <br /> additional 10,000 yards or each additional 10,000 yards or <br /> fraction thereof fraction thereof <br /> $288.95 for the first 100,000 $297.00 for the first 100,000 <br />100,001 - 200,000 cubic yards cubic yards, plus $14.20 for cubic yards, plus $15.00 for <br /> each additiona11 0,000 yards or each additional 10,000 yards or <br /> fraction thereof fraction thereof <br /> $430.89 for the first 200,000 $444.00 for the first 200,000 <br />In excess of 200,000 cubic yards cubic yards, plus $7.77 for each cubic yards, plus $8.00 for each <br /> additional 10,000 yards or additional 10,000 yards or <br /> fraction thereof fraction thereof <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.