Laserfiche WebLink
<br />City of Roseville 2007 Fee Schedule <br /> <br />Demolition Permit Fee: <br /> <br />~ " ~ .,,< .~-d ~~ :"; ~:i4;;;')::\0-~"" Curnint ~Jj}ount Propos\l!l ~oUlit <br /> D\l~cpnijon Tenant improvement/remodeling prior to building permit $55.00 $56.00 <br />Structures not connected to utilities 55.00 56.00 <br />Residential structures connected to city utilities 110.00 114.00 <br />Commercial structures connected to city utilities $250.00 $257.00 <br /> <br />Electrical Permit Fee: <br />Set through yearly contract with Contract Electrical Inspector <br /> <br />Fire Safety Inspection Fee: <br />An amount equal to eight percent (8%) of the amount detetmined by the Building Permit Fee <br />(except for single-family dwellings) to be charged and used to defray the cost of fire safety <br />inspections (Ord. 1237,3-13-2000, eff. 5-1-2000) <br /> <br />Grading Plan Review Fee: <br /> <br />- - - -Description:----:-::- - . -.-. .--Ctiiiint'1~nrOiiiit - --;- -- -:-:;:' ::.Proposeo AmOiint~---::. - <br /> ~ ~ , ' <br />50 cubic yards or less $0 $0 <br /> $52.75 for the first 10,000 cubic $54.00 for the first 10,000 <br />51 - 100,000 cubic yards yards, plus $26.25 for each cubic yards, plus $27.00 for <br /> additional 10,000 yards or each additional 10,000 yards or <br /> fraction thereof fraction thereof <br /> $288.95 for the first 100,000 $297.00 for the first 100,000 <br />100,001 - 200,000 cubic yards cubic yards, plus $14.20 for cubic yards, plus $15.00 for <br /> each additiona11 0,000 yards or each additional 10,000 yards or <br /> fraction thereof fraction thereof <br /> $430.89 for the first 200,000 $444.00 for the first 200,000 <br />In excess of 200,000 cubic yards cubic yards, plus $7.77 for each cubic yards, plus $8.00 for each <br /> additional 10,000 yards or additional 10,000 yards or <br /> fraction thereof fraction thereof <br /> <br />6 <br />